Loading...
Duke Lesley-CS071219 Page 1 of 1 Keith Marvin - Pointe West VII Drive From:   "Billy George" <bgeorge@pkce.com> To:   <paul.byrne@dukeconstructiononline.com> Date:   12/19/2007 9:49 AM Subject:   Pointe West VII Drive CC:   "Jack Evans" <jevans@pkce.com>, <kmarvin@ci.coppell.tx.us>   Paul,   As I told you over the phone, Keith Marvin (City of Coppell) and I discussed the Point West VII driveway opposite from Point West Boulevard.  Mr. Marvin reiterated a question about the driveway curb return geometry and its conformance with the approved plans.  Mr. Marvin stated that the curb radii and returns as shown on the approved plans are acceptable to the city.  We discussed options for changing that plans and, as has been our experience working with Coppell, the City is open to plan changes provided a solution is agreed upon prior to implementing them.   In looking at the stamped concrete shown on the plans on the east side of the drive, the following measurements are found.   East edge of concrete stamp: distance between stamping and curb face = 1.5’. West edge of concrete stamp: distance between stamping and curb face = 3.8’.   Please let me know if there is anything else you need from me at this time.   Thank you,   Billy   Billy George P.E. Senior Project Manager Mobile: 214-578-2683 bgeorge@pkce.com   Pacheco Koch Consulting Engineers 8350 N. Central Expwy, Suite 1000 Dallas, Texas 75206-1612 T 972.235.3031 • F 972.235.9544 www.pkce.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4768E947City_of...8/9/2010