Loading...
ST0301A-CS090626 RE: Pre-con announcementPage 1 of 2 Keith Marvin - RE: Pre-con announcement.....(Bethel rd. project) with S.Coppell rd. From:   "Steele, Olen" <olen.c1.steele@verizon.com> To:"Keith Marvin" <kmarvin@ci.coppell.tx.us>, "Wilkinson, Stefani"     <stefani.wilkinson@verizon.com> Date:   6/26/2009 9:37 AM Subject:   RE: Pre-con announcement.....(Bethel rd. project) with S.Coppell rd. CC:   "Shipman, Carl (CARL)" <carl.x.shipman@verizon.com>   Good morning Keith,   I spoke with Carl Shipman (const.cordinator) after the pre-con meeting Tuesday, will you have Larry Davis their to go over the other permit to release for the Bethel rd. project ,We have that order ready for const.also.Please call me if there is a issue, I will be out of town next week. Thanks.           Regards: Olen Steele Obligatory/Planner Engineering 2094 McGee Ln.Lewisville Tx.75077   Desk 972 318-0654 Cell   325 212-2076 From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Fri 6/26/2009 10:28 AM To: Wilkinson, Stefani Cc: Steele, Olen Subject: RE: Pre-con announcement Thanks for the update. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Wilkinson, Stefani" <stefani.wilkinson@verizon.com> 6/26/2009 9:22 AM >>> Keith, Work order went to Construction yesterday(6/25). We have the material for this order in stock. Construction told Olen that the path can be built in a week. What will take the longest is wreck out & splicing. Please see below Carl Shipman's number. He will be the contact for Construction. Carl-972-213-6459 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4A4496CACity_...8/11/2010 RE: Pre-con announcementPage 2 of 2 Thank You, Stefani Wilkinson Network Engineer office 972-318-5253 cell    214-406-9403 stefani.wilkinson@verizon.com -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Thursday, June 25, 2009 11:16 AM To: Wilkinson, Stefani Cc: Fortune, Charles D; Brown, Michael W (MICHAEL); Steele, Olen; Trevino, Richard L (RICK); Olinsky, Steven (STEVE) Subject: Fwd: Pre-con announcement Stefani, As you know, the City of Coppell has been asking Verizon to clear the utility conflicts along Coppell Road from Southwestern Blvd. to Bethel Rd. for quite some time now.  We are now at the point where we are ready to proceed with construction, and conflicts still exist with Verizon facilities.  I understand from our conversation that this project will go to construction shortly.  I look forward to receiving an estimate of when this will be completed. The city has awarded a construction contract for the road widening, and we will be hosting a pre-construction conference next week.  I would like to invite you and your construction contact to the meeting in order to minimize conflict in the field during construction.  Please see the attached letter for time and place of the meeting. If I can provide any additional information, please feel free to call me. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Rhonda Adloo 6/23/2009 2:48 PM >>> if you want to email this to Eric @ Terracon and Caleb @ F & N, or I could fax it to them file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4A4496CACity_...8/11/2010