Loading...
ST0301A-CS100329 (8/12/2010) Keith Marvin - RE: Bethel Road BridgePage 1 From: <Richard.Brewster@oncor.com> To: <kmarvin@coppelltx.gov> Date: 3/29/2010 2:44 PM Subject: RE: Bethel Road Bridge Okay, I'll get to work on it soon. -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Monday, March 29, 2010 2:37 PM To: Brewster, Richard Subject: Bethel Road Bridge Richard, The structural engineer designing the new bridge on Bethel Road has requested that we relocate the power pole on the east side of the bridge. He is concerned about having enough room to build the abutment. He is also concerned about the stability of the pole as they excavate for the construction of the structure. The pole on the west side of the bridge can remain. Our goal is to begin construction by June 1, 2010. if there is anything you need from me to assist in the relocation of this pole, please do not hesitate to call me. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system.