Okay, I'll get to work on it soon.
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Monday, March 29, 2010 2:37 PM
To: Brewster, Richard
Subject: Bethel Road Bridge
Richard,
The structural engineer designing the new bridge on Bethel Road has
requested that we relocate the power pole on the east side of the
bridge. He is concerned about having enough room to build the abutment.
He is also concerned about the stability of the pole as they excavate
for the construction of the structure. The pole on the west side of the
bridge can remain.
Our goal is to begin construction by June 1, 2010. if there is anything
you need from me to assist in the relocation of this pole, please do not
hesitate to call me.
Thanks,
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
Confidentiality Notice: This email message, including any attachments,
contains or may contain confidential information intended only for the
addressee. If you are not an intended recipient of this message, be
advised that any reading, dissemination, forwarding, printing, copying
or other use of this message or its attachments is strictly prohibited. If
you have received this message in error, please notify the sender
immediately by reply message and delete this email message and any
attachments from your system.