Loading...
ST0301A-CS100528 (8/13/2010) Keith Marvin - RE: Bethel Road IIPage 1 From: "Marty Murphy" <Martym@JRJPaving.com> To: "Keith Marvin" <kmarvin@coppelltx.gov> Date: 5/28/2010 1:13 PM Subject: RE: Bethel Road II thanks -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, May 28, 2010 1:08 PM To: Marty Murphy Cc: Caleb Thornhill Subject: Re: Bethel Road II I've left a message for Oncor. I'm available at 1:30 on Tuesday. I'll let you know if they can make it. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Marty Murphy" <Martym@JRJPaving.com> 5/28/2010 12:34 PM >>> Here is the schedule we are looking at for the bridge to help facilitate the coordination meeting for power shut down by Oncor; 6/14 - shut down road, demo bridge 6/21 - channel excavation, drill piers (need power shut down 6/21-6/25) 7/5-7/26 - complete channel excavation, pour abutments and caps and rip rap 8/2 - set beams and panels ( need power shut down 8/2-8/6) 8/9-9/7 - complete bridge and open to two lanes of traffic Please review and see if we can set up a meeting for next Tuesday in the afternoon if possible to discuss in the field with Oncor. Thanks for your help. Marty