Loading...
ST0301A-CS100608 (3) (8/8/2011) Keith Marvin - Re: Bethel Rd Bridge Closure BarricadingPage 1 From: Keith Marvin To:Dumke, Dean CC:Davis, Larry; Martym@JRJPaving.com; Thornhill, Caleb Date: 6/8/2010 1:54 PM Subject: Re: Bethel Rd Bridge Closure Barricading Attachments:project sign.pdf Dean, The city has no objection to the first phase of traffic control as submitted. I do have a few comments as far as phasing goes though: 1. Ensure all detour signage is erected prior to closing the road to traffic. 2. Project signs should be installed at each end of the project prior to road closure. This will provide contact information for the traveling public should they have a concern. 3. "End Road Work" signs along Denton Tap should be turned face down until the projects to the north and south pull their traffic control signage off Denton Tap. We don't want motorists to be confused by overlapping sings that indicate and end of work zone and beginning of another. 4. Do not close the road until after 9:00am. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Dean Dumke" <deand@JRJPaving.com> 6/8/2010 10:24 AM >>> Keith, Attached is the traffic control plan for closing the roadway for the bridge reconstruction. Once we get started on this, it will be altered to close down the section at Penfolds Ln. Please let me know if this works so we can get this closed down first thing tomorrow and begin work. If you have any questions regarding this, please feel free to contact me. Dean Dumke Sr Project Manager 214-499-3917 JRJ Paving (8/8/2011) Keith Marvin - Re: Bethel Rd Bridge Closure BarricadingPage 2 From: Robert Galler [mailto:jaygaller@sbcglobal.net] Sent: Tuesday, June 08, 2010 8:20 AM To: Dean Dumke Subject: Bethel Road Dean, TCP for the bridge closure on Bethel Road is attached. Thanks. Jay Galler Dallas Lite & Barricade, Inc. 214-748-5791 2010) Keith Marvin - RE: Bethel Rd Bridge Closure Barricading Page 1 From: "Dean Dumke" <deand @JRJ Paving .com> To: "Keith Marvin" <KMARVIN @coppelltx.gov> Date: 6/8/2010 11:04 AM Subject: RE: Bethel Rd Bridge Closure Barricading That is what I thought you meant. Can I get you to send me a PDF on what you need on the signs and I can get this taken care of ASAP? I have not done one for Coppell before and want to make sure I have it done correctly the first time. - - - -- Original Message---- - From: Keith Marvin [mailto:KMARVIN @coppelltx.gov] Sent: Tuesday, June 08, 2010 11:01 AM To: Dean Dumke Subject: Re: Bethel Rd Bridge Closure Barricading Project signs. I see the message boards are out. - - - -- Original Message---- - From: "Dean Dumke" <deand @JRJ Paving. com> To: Keith Marvin <KMARVIN @coppelltx.gov> Sent: 6/8/2010 11:01:48 AM Subject: RE: Bethel Rd Bridge Closure Barricading Message Boards or are you talking about the project signs that have all the job information with City of Coppell and JRJ informing about inprovements? - - - -- Original Message---- - From: Keith Marvin [mailto:KMARVIN @coppelltx.gov] Sent: Tuesday, June 08, 2010 10:56 AM To: Dean Dumke Subject: Re: Bethel Rd Bridge Closure Barricading Dean, What's the status on your project signs? - - - -- Original Message---- - From: "Dean Dumke" <deand @JRJ Paving. com> To: Keith Marvin <KMARVIN @coppelltx.gov> Sent: 6/8/2010 10:24:39 AM Subject: Bethel Rd Bridge Closure Barricading Keith, Attached is the traffic control plan for closing the roadway for the bridge reconstruction. Once we get started on this, it will be altered to close down the section at Penfolds Ln. Please let me know if this works so we can get this closed down first thing tomorrow and begin 2010) Keith Marvin - RE: Bethel Rd Bridge Closure Barricading Page 2 work. If you have any questions regarding this, please feel free to contact me. Dean Dumke Sr Project Manager 214 - 499 -3917 JRJ Paving From: Robert Galler [mailto: jaygaller @sbcglobal. net] Sent: Tuesday, June 08, 2010 8:20 AM To: Dean Dumke Subject: Bethel Road Dean, TCP for the bridge closure on Bethel Road is attached. Thanks. Jay Galler Dallas Lite & Barricade, Inc. 214 - 748 -5791 (IV3HV ) m PAO F ) awOU 0 0 z uj W. BETHEL RD THE U IOTH R mum Lm T& == TOHWTM ( VAM FmDCCN 192NIOIERW MWWASACOUVWTO' THE PROJECT OWNERS BY ff 19 mEAK AS A - MUMAN RACM AND IM PROJECIr 8 No 50VACAM WRL SE NSm"m3mffmmw WLAS LrM & R4nrAtE W_ mmm nw7" ANY LUMM LP I Mml3m HEARTHSTONE LN Gv3HV )Mom a j L 4m wnO13a EI LEI \ r ni I ROAD WORK AHEAD Table 6C-1. Suggested Advance Warning Sign Spacing Road Classification Conventional Highways Posted Speed (MPH) 25 Sign Spacing (Feet) 100 30 120 35 160 FIOAD WORK 40 240 0 0 45 320 m 50 400 B ENSON LN 55* 50 60* 600 65* 700 70* 800 75* 900 W 1000. Expressways or Freeways All Speeds See Typical Applications" 98: HsWwe between SV* ShOM be kwreawd to nave 15M W D&WW vmffft. 49na JwM 6a inc wwA to h" %"& Or mm MWMM w SOUTHWESTERN BLVD TYPE MjCEM MWOMM FM AMAL MhWn TM M AND RLAMUNT OF UWM RK"W MaW To T BE%= CONTL&GTOR AND PROD ECT OWNERS LffE W npONSMM SOM ME 10 SOMM IM wjw@C"mS0w MW 10 RSLM gM allpmaM OF --------- DEVM i*M FMOKM nm FrAGUM MANED 70 BE DBWnM PREPARED By: G.K. HOWELL 06107/2010 BETHEL ROAD BRIDGE REPLACEMENT WITH DETOUR SHEET 1 of 2 �wml DETOUR Z 0 FIOAD WORK lu 0 0 10 m Z B ENSON LN m �wml DETOUR 0 0 Z B ENSON LN m WORK DO rm z M IW C) 0 w cn 4c 2T L) dCr 0 ( 66 n V m m x I I is rm 2 BENSON m w 0 1 i Ili" ! lul L.-.. "' 0 I AAlk"EcirelT, R WORK AHEAD END ago ORK �� f 1p IMO AI 11V011 UN3 0 to to 0 SOUTHWESTERN BLVD tust I HEEL ROAD BRIDGE REPLACEMENT WITH DETOUR SHEET 2 of 2 -4 V � I III , � i.