Dean,
The city has no objection to the first phase of traffic control as submitted. I do have a few comments as far as phasing
goes though:
1. Ensure all detour signage is erected prior to closing the road to traffic.
2. Project signs should be installed at each end of the project prior to road closure. This will provide contact information
for the traveling public should they have a concern.
3. "End Road Work" signs along Denton Tap should be turned face down until the projects to the north and south pull their
traffic control signage off Denton Tap. We don't want motorists to be confused by overlapping sings that indicate and end
of work zone and beginning of another.
4. Do not close the road until after 9:00am.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Dean Dumke" <deand@JRJPaving.com> 6/8/2010 10:24 AM >>>
Keith,
Attached is the traffic control plan for closing the roadway for the
bridge reconstruction. Once we get started on this, it will be altered
to close down the section at Penfolds Ln. Please let me know if this
works so we can get this closed down first thing tomorrow and begin
work. If you have any questions regarding this, please feel free to
contact me.
Dean Dumke
Sr Project Manager
214-499-3917
JRJ Paving
(8/8/2011) Keith Marvin - Re: Bethel Rd Bridge Closure BarricadingPage 2
From: Robert Galler [mailto:jaygaller@sbcglobal.net]
Sent: Tuesday, June 08, 2010 8:20 AM
To: Dean Dumke
Subject: Bethel Road
Dean,
TCP for the bridge closure on Bethel Road is attached. Thanks.
Jay Galler
Dallas Lite & Barricade, Inc.
214-748-5791
2010) Keith Marvin - RE: Bethel Rd Bridge Closure Barricading Page 1
From: "Dean Dumke" <deand @JRJ Paving .com>
To: "Keith Marvin" <KMARVIN @coppelltx.gov>
Date: 6/8/2010 11:04 AM
Subject: RE: Bethel Rd Bridge Closure Barricading
That is what I thought you meant. Can I get you to send me a PDF on
what you need on the signs and I can get this taken care of ASAP? I
have not done one for Coppell before and want to make sure I have it
done correctly the first time.
- - - -- Original Message---- -
From: Keith Marvin [mailto:KMARVIN @coppelltx.gov]
Sent: Tuesday, June 08, 2010 11:01 AM
To: Dean Dumke
Subject: Re: Bethel Rd Bridge Closure Barricading
Project signs. I see the message boards are out.
- - - -- Original Message---- -
From: "Dean Dumke" <deand @JRJ Paving. com>
To: Keith Marvin <KMARVIN @coppelltx.gov>
Sent: 6/8/2010 11:01:48 AM
Subject: RE: Bethel Rd Bridge Closure Barricading
Message Boards or are you talking about the project signs that have all
the job information with City of Coppell and JRJ informing about
inprovements?
- - - -- Original Message---- -
From: Keith Marvin [mailto:KMARVIN @coppelltx.gov]
Sent: Tuesday, June 08, 2010 10:56 AM
To: Dean Dumke
Subject: Re: Bethel Rd Bridge Closure Barricading
Dean,
What's the status on your project signs?
- - - -- Original Message---- -
From: "Dean Dumke" <deand @JRJ Paving. com>
To: Keith Marvin <KMARVIN @coppelltx.gov>
Sent: 6/8/2010 10:24:39 AM
Subject: Bethel Rd Bridge Closure Barricading
Keith,
Attached is the traffic control plan for closing the roadway for the
bridge reconstruction. Once we get started on this, it will be altered
to close down the section at Penfolds Ln. Please let me know if this
works so we can get this closed down first thing tomorrow and begin
2010) Keith Marvin - RE: Bethel Rd Bridge Closure Barricading Page 2
work. If you have any questions regarding this, please feel free to
contact me.
Dean Dumke
Sr Project Manager
214 - 499 -3917
JRJ Paving
From: Robert Galler [mailto: jaygaller @sbcglobal. net]
Sent: Tuesday, June 08, 2010 8:20 AM
To: Dean Dumke
Subject: Bethel Road
Dean,
TCP for the bridge closure on Bethel Road is attached. Thanks.
Jay Galler
Dallas Lite & Barricade, Inc.
214 - 748 -5791
(IV3HV
) m
PAO F )
awOU
0 0
z
uj
W. BETHEL RD
THE U
IOTH R
mum Lm T& ==
TOHWTM (
VAM
FmDCCN
192NIOIERW
MWWASACOUVWTO'
THE PROJECT OWNERS BY
ff 19 mEAK AS A - MUMAN
RACM AND IM PROJECIr
8 No 50VACAM WRL SE
NSm"m3mffmmw
WLAS LrM & R4nrAtE W_
mmm nw7" ANY LUMM
LP I
Mml3m
HEARTHSTONE LN
Gv3HV
)Mom
a j
L 4m
wnO13a
EI LEI
\ r
ni
I
ROAD
WORK
AHEAD
Table 6C-1. Suggested Advance Warning Sign Spacing
Road Classification
Conventional Highways
Posted Speed (MPH)
25
Sign Spacing (Feet)
100
30
120
35
160
FIOAD WORK
40
240
0 0
45
320
m
50
400
B ENSON LN
55*
50
60*
600
65*
700
70*
800
75*
900
W
1000.
Expressways or
Freeways
All Speeds
See Typical
Applications"
98:
HsWwe between SV* ShOM be kwreawd to nave 15M W D&WW vmffft.
49na JwM 6a inc wwA to h" %"& Or mm MWMM w
SOUTHWESTERN BLVD
TYPE MjCEM MWOMM FM AMAL MhWn TM M
AND RLAMUNT OF UWM RK"W MaW To T
BE%=
CONTL>OR AND PROD ECT OWNERS LffE
W npONSMM SOM ME 10 SOMM IM
wjw@C"mS0w
MW 10 RSLM gM allpmaM OF ---------
DEVM i*M FMOKM
nm FrAGUM MANED 70 BE DBWnM
PREPARED By: G.K. HOWELL
06107/2010 BETHEL ROAD
BRIDGE REPLACEMENT WITH DETOUR
SHEET 1 of 2
�wml
DETOUR
Z
0
FIOAD WORK
lu
0 0
10
m
Z
B ENSON LN
m
�wml
DETOUR
0 0
Z
B ENSON LN
m
WORK
DO
rm
z
M
IW
C) 0
w
cn 4c
2T
L) dCr
0
( 66
n
V
m
m
x I I is
rm
2 BENSON
m
w
0 1 i Ili" ! lul
L.-.. "'
0 I
AAlk"EcirelT,
R
WORK
AHEAD
END
ago ORK
�� f
1p
IMO AI 11V011
UN3
0
to
to
0
SOUTHWESTERN BLVD
tust I HEEL ROAD
BRIDGE REPLACEMENT WITH DETOUR