ST0301A-CS100617 (8/13/2010) Keith Marvin - Fwd: Bethel Rd - RFI 003 Plan vs GPS coord conflictPage 1 From: Keith Marvin To:Thornhill, Caleb CC:Hatley, Tricia Date: 6/17/2010 8:06 AM Subject: Fwd: Bethel Rd - RFI 003 Plan vs GPS coord conflict Attachments:RFI 003 Plan vs GPS coord conflict.pdf Caleb, Please look into this issue. If we need to meet to discuss this, let me know so Larry or I can attend. As far as conflicts go, if we can adjust to avoid them, we may need to do that. I don't want to loose time waiting for utility companies. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Dean Dumke" <deand@JRJPaving.com> 6/17/2010 7:59 AM >>> Keith, When trying to stake the location of the north wall on the project to verify that there was not a conflict between the wall and telephone poles/franchise utilities, my survey personnel found a difference in the plan vs coordinates given. This also brings up if there might be additional conflicts between the 2. Can you have engineer or survey rep give Terry, JRJ Survey, a call and schedule a meeting between the 2 so we can get this worked out. Thank you, Dean Dumke Sr Project Manager 469-223-7879 JRJ PAVING, L. P. _______________________