ST0301A-CS100617
(8/13/2010) Keith Marvin - Fwd: Bethel Rd - RFI 003 Plan vs GPS coord conflictPage 1
From: Keith Marvin
To:Thornhill, Caleb
CC:Hatley, Tricia
Date: 6/17/2010 8:06 AM
Subject: Fwd: Bethel Rd - RFI 003 Plan vs GPS coord conflict
Attachments:RFI 003 Plan vs GPS coord conflict.pdf
Caleb,
Please look into this issue. If we need to meet to discuss this, let me know so Larry or I can attend.
As far as conflicts go, if we can adjust to avoid them, we may need to do that. I don't want to loose time waiting for utility
companies.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Dean Dumke" <deand@JRJPaving.com> 6/17/2010 7:59 AM >>>
Keith,
When trying to stake the location of the north wall on the project to
verify that there was not a conflict between the wall and telephone
poles/franchise utilities, my survey personnel found a difference in the
plan vs coordinates given. This also brings up if there might be
additional conflicts between the 2. Can you have engineer or survey rep
give Terry, JRJ Survey, a call and schedule a meeting between the 2 so
we can get this worked out.
Thank you,
Dean Dumke
Sr Project Manager
469-223-7879
JRJ PAVING, L. P.
_______________________