ST0301A-CS100618 (4)
(8/13/2010) Keith Marvin - Bethel Road ClosurePage 1
From: Keith Marvin
To:Battalion Chiefs; Fire Admin Staff; Griffin, Ken; Logan, Sharon; Oat...
CC:Adloo, Rhonda; Birdsall, Per; Canizares, Mario; Davis, Larry; Hender...
Date: 6/18/2010 4:43 PM
Subject: Bethel Road Closure
The Bethel Road closure west of the bridge is moving further west. Beginning at 9:00am Monday 6/21/2010 Bethel Road
will be closed at Park Lane.
Access to all Benson Ln., Penfolds Ln., and Rosemount Ct. addresses will be from Park Lane.
Access to 234 Bethel Road will only be available from Harris St. An address sign has been erected on Harris at the driveway to this
property.
Access to 256, 260, and 264 W. Bethel will continue to be available from Bethel Road.
Bethel will remain closed at Armstrong on the east side of the bridge.
My city issued phone number is 469-576-0664. Feel free to call me with any questions or feedback about this project.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
(1/12/2011) Keith Marvin - Re: SignsPage 1
From:
Keith Marvin
To:
Clay Phillips
CC:
Ken Griffin
Date:
6/18/2010 12:26 PM
Subject:
Re: Signs
The contractor is supposed to be placing additional signage and moving message boards today. I'll verify
this afternoon.
Keith
-----Original Message-----
From: Clay Phillips
To: Keith Marvin <KMARVIN@coppelltx.gov>
Sent: 6/18/2010 12:24:17 PM
Subject: Signs
I am still getting killed about there not being enough signs warning about no through traffic from Dtap onto
Bethel. Any progress.