Loading...
ST8703-CS 871117GINN, INC. CONSULTING ENGINEERS TO: Alan D. Ratliff, City Manager FROM: H. Wayne Ginn, P.E., City Engineer DATE: November 17, 1987 SUBJECT: Samuel Blvd. Paving / History The above subject project was constructed by Univest Development Co. as part of their Parkwood - Phase II development. The scope of this development was to construct Parkway Blvd. from Samuel Blvd. west to Denton Tap Rd. and construct the west halves of Moore Rd. (approx.) and Samuel Blvd. from Parkway Blvd. south to Sandy Lake Rd. The plans were designed in October of 1983. Samuel Blvd. construction was completed in October of 1984. The subdivision ordinance in affect at that time was Ordinance No. 226, passed October 28, 1980. Sidewalks .were required in that ordinance. The plans were apparently approved by the City without sidewalks being required at this particular stage of development. This would appear to not be unusual due to the fact that if sidewalks are constructed prior to the adjacent tracts being developed, replacement of the sidewalk is usually needed due to the damage that usually occurs. This could explain possibly why the section of sidewalk from Lee Elementary School south to Sandy Lake Rd. was not required. Lee Elementary School was open and functioning as such when Samuel Blvd. was constructed. Also, Meadowridge - Phase I which is the development on the north side of the school was under construction at the same time as Samuel Blvd. Neither of these developments were apparently required by the City to include sidewalks in their plans either along their frontage to Samuel Blvd. We realize the information presented herein may be somewhat vague but since the plats and plans were approved before our time, it is the best information we have available. We will be happy to assist you further on this matter as your needs may require. cc: ~tewe C~m Kevin Peiffer Randy Fleming File 241 17103 Prest,~m Road · Suite lC}0 · [B 11§ · Dallas. Te','as 7..=48 · Phcmc v14.,'248-4000