Loading...
ST0301A-CS100630 (1/21/2011) Keith Marvin - RE: Wall DetailPage 1 From: Caleb Thornhill <bct@freese.com> To: Keith Marvin <kmarvin@coppelltx.gov> Date: 6/30/2010 3:15 PM Subject: RE: Wall Detail I've got our structural guys looking a detail for that and the modified railing. I'll get an update from them and let you know tomorrow morning. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Wednesday, June 30, 2010 2:55 PM To: Caleb Thornhill Subject: Wall Detail Caleb, Have you had any luck with the retaining wall detail to accommodate the rock ledge rather than the form liner? Keith Marvin, P.E. Project Engineer (972) 304-3681 This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. (8/16/2010) Keith Marvin - FW: City of Coppell C BCW BCW 1 #3675 for ApprovalPage 1 From: "Kim Entrekin" <Kime@JRJPaving.com> To: <kmarvin@coppelltx.gov> CC: "Dean Dumke" <deand@JRJPaving.com>, <steve@ntbridge.com> Date: 6/30/2010 8:35 AM Subject: FW: City of Coppell C BCW BCW 1 #3675 for Approval Attachments: City of Coppell C BCW BCW 1.pdf These were sent out last Friday, I have resent these this morning via FedEx the tracking # 873163987571 -----Original Message----- From: Kim Entrekin Sent: Friday, June 25, 2010 4:09 PM To: Kim Entrekin Subject: FW: City of Coppell C BCW BCW 1 #3675 for Approval -----Original Message----- From: Dean Dumke Sent: Friday, June 25, 2010 3:10 PM To: Kim Entrekin Cc: Marty Murphy Subject: FW: City of Coppell C BCW BCW 1 #3675 for Approval Kim, Please submit the attached bridge submittals to City of Coppell for approval by their structural engineer. Thank you, Dean -----Original Message----- From: support @ ntbridge [mailto:support@ntbridge.com] Sent: Friday, June 25, 2010 3:01 PM To: Dean Dumke Cc: Steve Goodman Subject: City of Coppell C BCW BCW 1 #3675 for Approval Dean, Steve Goodman asked that I forward this to you and ask that you submit it to the structural engineer for approval. If you have any questions let us know. Thank you, Laura Chance North Texas Bridge Co., Inc. Ofc: 972-924-3557 Fax 972-924-4713 -----Original Message----- From: Ralph Moralez [mailto:ralph.moralez@bexarconcrete.com] (8/16/2010) Keith Marvin - FW: City of Coppell C BCW BCW 1 #3675 for ApprovalPage 2 Sent: Friday, June 25, 2010 2:24 PM To: Steve Goodman Cc: support@ntbridge.com Subject: City of Coppell C BCW BCW 1 #3675 for Approval Steve Goodman North Texas Bridge Co., Inc. p. 972.924.3557 steve@ntbridge.com cc: support@ntbridge.com Reference: City of Coppell, Texas Bethel & Coppell Rd Reconstruction Structure Name(s): Bethel Road Bridge Fabricator: BCW Fabricator Job No.: 3675 Product(s): Type C Beams Sheet Listing: E-1,E-2,I-1,C-1-C-9,BP-1,BP-2,S-C-1,S-C-2 No. Sheets: 16 Submission Method: Email (1 of 1) Please verify the beam design and non-standard strand pattern shown on the attached shop drawings sent for approval this was not included on the IBNS sheet from the contract plans. Note: With this beam design the uplift force exceeds the hold down capacity, it seems like this beam design will not work. Attach for review is one set of shop drawings for the above mentioned project and product(s), please forward to the appropriate office for review and approval. These drawings are for review and approval prior to fabrication of the items stated herein. Please return reviewed plan sets to: Primary Recipient: Detailing Office / Fabricator: Bexar Concrete Works I, Ltd. (BCW) Ralph S. Moralez Ralph.Moralez@BexarConcrete.com Carbon Copy Recipients: ("CC") Contractor: North Texas Bridge Co., Inc. (NTB) Steve Goodman steve@ntbridge.com support@ntbridge.com (8/16/2010) Keith Marvin - FW: City of Coppell C BCW BCW 1 #3675 for ApprovalPage 3 If you have any questions or require additional information please contact me. Ralph S. Moralez Bexar Concrete Works I, Ltd. p. 210.497.3773 Ralph.Moralez@BexarConcrete.com BCWI Job #3675 type C beams for approval cc: JH file