Loading...
ST0301A-LR100813R�UAncE G GEOTECHI'IfCRL GRC?UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 08/12/2010 Report Date: 08/13/2010 Sampled By: Robert Nance Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Bridge Abutment Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Reinforcing Steel Inspection LAB NO: 89076 TEST RESULTS Report No: 89076 Page 1 of 1 We visually inspected the reinforcing steel at bridge abutment #4. Our inspection included verifying the proper size of the reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for excessive rust deposits. On the basis of our visual inspection, the reinforcing steel placement meets the requirements of the project plans and specifications. • Size: 6 - #11's • Cover: burning forms • Splice Length: NA • Cleanliness: Yes • Properly Tied: Yes • Cleanliness of Form Work: Clean • Proper Support: Yes Remarks: Reinforcing steel was found to be touching forms. The contractor was informed and requested a re- inspection before concrete placement on 08/13/10. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Rhonda Adloo 1 -hc The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Robert P. Nance, Sr. Project Manager ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING AND ENGINEERING 10610 Newkirk, Suite #202, Dallas, Texas 75220 Phone #972 -444 -8889 Fax #972- 444 -8893 REINFORCING STEEL OBSERVATION REPORT CLIENT: DISTRIBUTION: - PROJECT pP AGG REPOR : f 4' REPORT DATE: re)- -6 I ru TECHNICIAN: 7 6.4 � j e WEATHER: C Jry HO T AREAS OBSERVED: j <T �r /qr�r,� 4 • / . irnit,icc - inI6 � A.'`�f -�_ 1 3 u iI OBSERVATION CHECK LIST: �( SIZE: '�� 5 J 5/�5 ✓ COVER: SPLICE LENGTH: 4 CLEANLINESS: *G PROPERLY TIED: CLEANLINESS OF FORM WORK: 7- ¢ 9r1 PROPER SUPPORT: REFERENCE DRAWING: A'lci ) A -201 QC �$ doe REMARKS: Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without TA./ the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP R1-UAncE G GEOTECHI'IfCRL GRC?UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 08/11/2010 Report Date: 08/13/2010 Sampled By: Nance, Robert Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Retaining Wall Footing Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Nuclear Field Density Test LAB NO: 89124 Test Method: See Below TEST RESULTS Report No: 89124 Page 1 of 1 Optimum Maximum Proctor Moisture Dry Density Proctor No Date (%) (pcf) Color / Description 7826 06/23/2010 16.6 111.9 Light Gray and Dark Brown Clay Specification Moisture Band Specification No. Compaction, % Minimum Maximum 1 95% -2.0 4.0 Material: Test Lift # / No. Depth Location Wet Moisture Dry Percent Density Content Density Proctor Spec. Moisture Proctor Pass (pcf) % (pcf) Number No. Deviation Density Fail SG Retaining wall footing, E. side, sta 115.9 12.5 103.0 7826 1 -4.1 92.0 Fail 38 +50 Gauge No.: 4877 Daily Standard Counts: 08/11/2010 DS: 4453 MS: 416 Test Methods: ASTM D6938 -07 Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Rhonda Adloo 1 -hc The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Robert P. Nance, Sr. Project Manager