Loading...
ST0301A-CS100709 (2) (8/17/2010) Keith Marvin - RE: Bethel Rd at bridge - Telephone pole holdPage 1 From: "Dean Dumke" <deand@JRJPaving.com> To: "Keith Marvin" <kmarvin@coppelltx.gov> Date: 7/9/2010 5:50 PM Subject: RE: Bethel Rd at bridge - Telephone pole hold Keith, I contacted Rick Fielding, Oncor #469-261-5255, and he gave me the number for Scott Lewis, Oncor #469-964-3385, and asked Scott for the number of company I needed to contact to hold pole. Scott gave me Jodie Alison, Infrastrux #903-818-4068, left 2 messages, no return call. Call Scott back and he gave me Mike Young, Oncor #469-261-6324. Spoke with Mike and he told me that Jodie was on vacation this week and gave me Jodie's bosses info, Kevin Hooper, Infrastrux #903-271-8419, let 2 messages, no return call. Without speaking with anyone, I cannot send out fliers to residents until we can coordinate for someone to hold pole. Hopefully, we can get a hold of someone on Monday so we can do the switch over on Wednesday, since residents need 48 hour notice. Any help you can give on Monday to get me to someone so we can proceed would be helpful. Thank you and have a good weekend, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, July 09, 2010 3:19 PM To: lredick1@oncor.com Cc: Dean Dumke; Charles.Nutt@oncor.com; Frederick.Beamis@oncor.com; Jeff.Graves@oncor.com; Jerry.Bates@oncor.com; Richard.Brewster@oncor.com Subject: RE: Bethel Rd at bridge Larry, The contractor has rescheduled this work for Tuesday 7/13/2010 beginning at 9:00am. He has been trying to schedule a crew to come and brace the pole. Please have someone contact Dean at the number below, or provide me the appropriate contact so I can pass it along. Dean Dumke Sr Project Manager #469-223-7879 (8/17/2010) Keith Marvin - RE: Bethel Rd at bridge - Telephone pole holdPage 2 JRJ PAVING, L. P. Your assistance in this matter is appreciated. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> <lredick1@oncor.com> 7/7/2010 12:19 PM >>> I will talk with my supervisor again, but when I discussed it with him he stated that this is what needed to be done in this situation. Larry Redick PMDS Project Designer Senior 972-323-8917 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Wednesday, July 07, 2010 8:45 AM To: Redick, Larry; Brewster, Richard Cc: Nutt, Charles; Beamis, Scott; Graves, Jeff Subject: RE: Bethel Rd at bridge Larry, For some reason I received Richard's response to your email, but not your original email. The pole in question is clear of the final improvements, the problem we have is that there is an 8" water line that connects to the 16" that is approximately 10 feet deep and immediately adjacent to the new pole set by Oncor. When Richard and I met on site we discussed the pole location, and the city agreed to extend the 16" water line approximately 15 additional feet to get around the pole. We have no ability to move this 8" due to the existing location and an existing brick screening wall adjacent to the line. We have incurred an additional project expense of approximately $2,000 in the extension of the 16" line. In the interest of protecting Oncor's utility pole, and for the safety of our contractor we are requesting assistance in bracing this pole as we work around it. This assistance could be in the form of bracing the pole with your manpower and equipment, or in providing an Oncor representative with the knowledge and experience to help our contractor do it safely. Keith Marvin, P.E. Project Engineer (972) 304-3681 (8/17/2010) Keith Marvin - RE: Bethel Rd at bridge - Telephone pole holdPage 3 >>> <Richard.Brewster@oncor.com> 7/7/2010 8:06 AM >>> Larry, It was my impression that once the pole was moved, it would be clear of the construction. That was the whole reason for moving it in the first place, to clear the new construction of the bridge and, I thought, the water line as well. ________________________________ From: Redick, Larry Sent: Wednesday, July 07, 2010 8:03 AM To: Brewster, Richard Cc: Keith Marvin; Beamis, Scott; Nutt, Charles; Graves, Jeff Subject: Bethel Rd at bridge Richard, The contractor that is doing the water line relocation at Bethel road east of the bridge that is being replaced, requested we come and hold the pole for them while they do the replacement. I advised them there would be charges and the city stated that you told them the pole would be clear of their work. Do you recall a conversation with them about this situation? Also Keith, the contractors called us yesterday afternoon requesting that we be there this morning and I advised him I did not know if that would happen. I also advised him it would cost approximately $235 per hour that we have a crew secured to the pole. We would also need some time, (at least 24 hours), to schedule a crew to do that. Larry Redick PMDS Project Designer Senior 972-323-8917 Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If (8/17/2010) Keith Marvin - RE: Bethel Rd at bridge - Telephone pole holdPage 4 you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system. Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system.