Loading...
ST0301A-CS1007122010) Keith Marvin - FW: Bethel Rd at bridge Page 1 From: "Dean Dumke" <deand @JRJ Paving .com> To: "Keith Marvin" <kmarvin @coppelltx.gov> Date: 7/12/2010 10:05 AM Subject: FW: Bethel Rd at bridge Attachments: ONCOR Chk for 16in Tie in.pdf; ONCOR Inv for Holding Telephone Pole for 16i n Tie in.doc Keith, FYI, will need to get with you so I can get reimbursed for this, either change order or adding addition to one of the quantities. Dean Dumke Sr Project Manager #469- 223 -7879 JRJ PAVING, L. P. - - - -- Original Message---- - From: Dean Dumke Sent: Monday, July 12, 2010 10:05 AM To: 'Iredick1 @oncor.com' Subject: RE: Bethel Rd at bridge Larry, Attached is a copy of the check for the invoice you sent for holding the telephone pole on Bethel Rd. Crews are to be on site at this location at 9am, Wednesday, July 14, 2010. If less time is needed, JRJ will be reimbursed for the monies not used. Thank you, Dean Dumke Sr Project Manager #469- 223 -7879 JRJ PAVING, L. P. - - - -- Original Message---- - From: Iredickl@oncor.com [mailto:lredick1 @oncor.com] Sent: Monday, July 12, 2010 8:26 AM To: kmarvin @coppelltx.gov; Dean Dumke Cc: Charles. Nutt @oncor.com; Frederick. Beam is @oncor.com; Jeff. Graves @oncor.com; Jerry. Bates @oncor.com; Richard. Brewster @oncor.com; Trey. Humphreys @oncor.com Subject: RE: Bethel Rd at bridge After talking with Manager he stated we would hold the pole and charge for time we are there. We will charge this out based on a 4 hour charge 2010) Keith Marvin - FW: Bethel Rd at bridge Page 2 for the crew to be there. I have attached an invoice for you. Also confirming our phone conversation you would like this done on Wednesday 7/14, starting your work at 9:00 am. Larry Redick PMDS Project Designer Senior 972 - 323 -8917 - - - -- Original Message---- - From: Keith Marvin [mailto:kmarvin @coppelltx.gov] Sent: Friday, July 09, 2010 3:19 PM To: Redick, Larry Cc: deand @JRJPaving.com; Nutt, Charles; Beamis, Scott; Graves, Jeff; Bates, Jerry; Brewster, Richard Subject: RE: Bethel Rd at bridge Larry, The contractor has rescheduled this work for Tuesday 7/13/2010 beginning at 9 He has been trying to schedule a crew to come and brace the pole. Please have someone contact Dean at the number below, or provide me the appropriate contact so I can pass it along. Dean Dumke Sr Project Manager #469- 223 -7879 J RJ PAVING, L. P. Your assistance in this matter is appreciated. Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> <Iredick1 @oncor.com> 7/7/2010 12:19 PM >>> will talk with my supervisor again, but when I discussed it with him he stated that this is what needed to be done in this situation. Larry Redick PMDS Project Designer Senior 972 - 323 -8917 - - - -- Original Message---- - From: Keith Marvin [mailto:kmarvin @coppelltx.gov] Sent: Wednesday, July 07, 2010 8:45 AM To: Redick, Larry; Brewster, Richard 2010) Keith Marvin - FW: Bethel Rd at bridge Page 3 Cc: Nutt, Charles; Beamis, Scott; Graves, Jeff Subject: RE: Bethel Rd at bridge Larry, For some reason I received Richard's response to your email, but not your original email. The pole in question is clear of the final improvements, the problem we have is that there is an 8 water line that connects to the 16" that is approximately 10 feet deep and immediately adjacent to the new pole set by Oncor. When Richard and I met on site we discussed the pole location, and the city agreed to extend the 16" water line approximately 15 additional feet to get around the pole. We have no ability to move this 8" due to the existing location and an existing brick screening wall adjacent to the line. We have incurred an additional project expense of approximately $2,000 in the extension of the 16" line. In the interest of protecting Oncor's utility pole, and for the safety of our contractor we are requesting assistance in bracing this pole as we work around it. This assistance could be in the form of bracing the pole with your manpower and equipment, or in providing an Oncor representative with the knowledge and experience to help our contractor do it safely. Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> <Richard.Brewster @oncor.com> 7/7/2010 8:06 AM >>> Larry, It was my impression that once the pole was moved, it would be clear of the construction. That was the whole reason for moving it in the first place, to clear the new construction of the bridge and, I thought, the water line as well. From: Redick, Larry Sent: Wednesday, July 07, 2010 8:03 AM To: Brewster, Richard Cc: Keith Marvin; Beamis, Scott; Nutt, Charles; Graves, Jeff Subject: Bethel Rd at bridge Richard, 2010) Keith Marvin - FW: Bethel Rd at bridge Page 4 The contractor that is doing the water line relocation at Bethel road east of the bridge that is being replaced, requested we come and hold the pole for them while they do the replacement. I advised them there would be charges and the city stated that you told them the pole would be clear of their work. Do you recall a conversation with them about this situation? Also Keith, the contractors called us yesterday afternoon requesting that we be there this morning and I advised him I did not know if that would happen. I also advised him it would cost approximately $235 per hour that we have a crew secured to the pole. We would also need some time, (at least 24 hours), to schedule a crew to do that. Larry Redick PMDS Project Designer Senior 972 - 323 -8917 Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system. Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system. Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. 2010) Keith Marvin - FW: Bethel Rd at bridge Page 5 If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system. REMIT TO and MAKE CHECK PAYABLE TO: Oncor Electric Delivery 1015 Hutton I I N V O I C E Carrollton, Texas 75006 Attn: Larry Redick Fax: 972 - 323 -8925 Customer: Name: JRJ Paving Invoice # WR - Address: 1805 Royal Lane, suite 107 City: Dallas State: Tx Zip: 75229 ATTN: Dean Dumke Date: Tuesday, August 17, 2010 * Remit payment to the above address. * Please include the Invoice # on your check If you have any questions about this invoice please contact Larry Redick at 972 - 323 -8917. {Invoice.doc} MHorak June 2004 JRJ PAVING, LP 088066 ONCOR ELECTRIC DELIVERY ATTN: LARRY RIDICK Check: 88066 1015 HUTTON Date: 7/12/2010 CARROLLTON, TX 75006 Vendor: 64503 Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid WR 676.08 676.08 0.00 0.00 676.08 676.08 676.08 0.00 0.00 676.08