ST0301A-CN100713
Page 1 of 1
Keith Marvin - Bethel Rd - Change Order 5 Proposal
From: "Dean Dumke" <deand@JRJPaving.com>
To: "Keith Marvin" <kmarvin@coppelltx.gov>
Date: 7/13/2010 8:00 PM
Subject: Bethel Rd - Change Order 5 Proposal
CC: "Butch Cross" <butchc@JRJPaving.com>
Attachments: CO5 Add 6in H2O for FH.pdf
Keith,
Attached is the change order proposal 5 for adding the additional 25 lf of 6” water line to cross Bethel Rd and
install fire hydrant at the location shown on plans. Plans show 16” water line to be on south side of roadway, but
16” water line is actually at the north side of the roadway, which necessitates the additional footage. Instead of
having an addition line item for 6” water pipe, I have proposed on the proposal that the line item for 8” PVC water
line be used instead.
Please let me know that this is approved and we can proceed with this work on site.
Thank you,
Dean Dumke
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C3CC5EDCity...8/17/2010
òêòìûæóîõðì
ìÊÍÌÍÉרùÔÛÎÕ×íÊØ×Ê
øûè÷
èíùÓÈÃÍÖùÍÌÌ×ÐÐìêíìíéûðöíêú×ÈÔ×ÐêØóó
ûèèîñ×ÓÈÔïÛÊÆÓÎ
úçðð÷èóîíî÷ìêóùóîõ
çÎÓÈ
óÈ×Ïø×ÉÙÊÓÌÈÓÍÎëÇÛÎÈÓÈÃçÎÓÈìÊÓÙ×èÍÈÛÐûÏÍÇÎÈ
ûØØ×ØÈÍóÎÉÈÛÐÐöÓÊ×ôÃØÊÛÎÈ
ù
øêìæùåÛÈ×ÊÐÓÎ×ðö
èÍÈÛÐéÓÈ×ìÛÆÓÎÕóÏÌÊÍÆ×Ï×ÎÈÉ
êÍÇÎØ×ØûÏÍÇÎÈ
ù
øêìæùåÛÈ×ÊÐÓÎ×ðö
èÍÈÛÐéÓÈ×ìÛÆÓÎÕóÏÌÊÍÆ×Ï×ÎÈÉ
îÍÈ×Éå×ÛÐÊ×ÛØÃÔÛÆ×ÛÐÓÎ×ÓÈ×ÏÖÍÊÌÓÌ×ûÚÍÆ×ÛÊ×ÈÔ×ÎÇÏÚ×ÊÉÖÍÊÈÔ×
ÍÖÅÛÈ×Ê
ÐÓÎ×ÛÎØÈÔ×ÙÍÉÈÖÍÊ
ÖÅ×ÛÊ×ÇÉÓÎÕÐÓÎ×ÓÈ×ÏÉÙÍÏ×ÍÇÈÈÍ
ÐÖÍÖ
ÅÛÈ×ÊÐÓÎ×å×ÅÍÇÐØÐÓÑ×ÈÍÌÊÍÌÍÉ×ÒÇÉÈÛØØÓÎÕÈÔ×ÛØØÓÈÓÍÎÛÐ
ÐÖÈÍÍÇÊÌÛÃÛÌÌÐÓÙÛÈÓÍÎÈÍ
ÛÆÍÓØÛØØÓÈÓÍÎÛÐÙÔÛÎÕ×É
éÔÍÇÐØÃÍÇÔÛÆ×ÛÎÃËÇ×ÉÈÓÍÎÉÍÊÊ×ËÇÓÊ×ÛØØÓÈÓÍÎÛÐÓÎÖÍÊÏÛÈÓÍÎÌÐ×ÛÉ×Ö××ÐÖÊ××ÈÍÙÛÐÐÏ×
ê×ÉÌ×ÙÈÖÇÐÐÃéÇÚÏÓÈÈר
úÇÈÙÔùÊÍÉÉ
÷ÉÈÓÏÛÈÍÊ