Loading...
ST0301A-AG100727÷ÎÕÓÎ××ÊÓÎÕ ø÷ìè ûõ÷îøûê÷ëç÷éèöíêï òÇÐà  øûè÷  ù óè÷ï åíêñé÷ééóíîùíîé÷îèê÷õçðûê  ê÷éíðçèóíî óè÷ïèãì÷ óè÷ïùûìèóíî ùÍÎÉÓØ×ÊÛÌÌÊÍÆÛÐÍÖÛê×ÉÍÐÇÈÓÍÎÈÍÊרÇÙ×ø×ÎÈÍÎèÛÌêÍÛØÈÍÍÎ×ÐÛÎ×ÉÍÇÈÔÚÍÇÎØÛÎØÍÎ×ÐÛÎ×ÎÍÊÈÔÚÍÇÎØ ÛÐÍÎÕø×ÎÈÍÎèÛÌÛÈÈÔ×ÓÎÈ×ÊÉ×ÙÈÓÍÎÍÖú×ÈÔ×ÐêÍÛØÖÍÊÛÌ×ÊÓÍØÍÖÇÌÈÍ ÙÛÐ×ÎØÛÊØÛÃÉÖÊÍÏÈÔ×Ú×ÕÓÎÎÓÎÕÍÖ ÅÍÊÑÛÎØÛÇÈÔÍÊÓÂÓÎÕÈÔ×ïÛÃÍÊìÊÍè×ÏÈÍÉÓÕÎÛÎØ×Ä×ÙÇÈ×ÛÎÃÎ×Ù×ÉÉÛÊÃØÍÙÇÏ×ÎÈÉ õíûðé  ÷ä÷ùçèóæ÷éçïïûêã ûÌÌÊÍÆÛÐÍÖÈÔÓÉÊ×ÉÍÐÇÈÓÍÎÅÓÐÐÛÐÐÍÅÖÍÊòêòìÛÆÓÎÕÈÍÌÊÍÙ×רÅÓÈÔÈÔ×ÙÍÎÉÈÊÇÙÈÓÍÎÍÖú×ÈÔ×ÐêÍÛØÛÈÈÔ×ÓÎÈ×ÊÉ×ÙÈÓÍÎ ÍÖø×ÎÈÍÎèÛÌ éÈÛÖÖÅÓÐÐÚ×ÛÆÛÓÐÛÚÐ×ÈÍÛÎÉÅ×ÊÛÎÃËÇ×ÉÈÓÍÎÉÛÈÈÔ×ùÍÇÎÙÓÐÏ××ÈÓÎÕ öóîûîùóûðùíïï÷îèé ê÷ùíïï÷îø÷øûùèóíîûùèóíîèûñ÷îúãùíçîùóð ßÐÐÎÑÊÛÜ ÞÇ éÈÛÖÖÊ×ÙÍÏÏ×ÎØÉÛÌÌÊÍÆÛÐÍÖÈÔÓÉê×ÉÍÐÇÈÓÍÎ Ý×ÌÇ ÝÑËÒÝ×Ô  ÑÒ ßÞÑÊÛ ÜßÌÛ ïÍÈÓÍÎÈÍûÌÌÊÍÆ× ê×É    ïèÇÎÎ×ÐÐ éôÇÎÈ æÍÈ× ðÓÚÚÃúÛÐÐ        ø×ÎÈÍÎèÛÌðÛÎ×ùÐÍÉÇÊ× MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM : Keith R. Marvin, P.E., Project Engineer DATE: July 27, 2010 RE: Consider approval of a Resolution to reduce Denton Tap Road to one lane southbound, and one lane northbound along Denton Tap at the intersection of Bethel Road for a period of up to 40 calendar days from the beginning of work; and authorizing the Mayor to sign and execute any necessary documents. On April 27, 2010 the City of Coppell awarded a contract to JRJ Paving for the reconstruction of Bethel Road from Penfolds Lane to Denton Tap Road. This project will greatly improve the function of the intersection of Bethel Road and Denton Tap by adding dedicated turn lanes to eastbound Bethel Road. As part of these improvements the median noses in Denton Tap are being pushed back, the brick paver bands are being removed, and new stamped concrete bands are being installed to line up with the new north and south curb lines of Bethel Road. Bethel Road will remain open on both sides of Denton Tap for the duration of this work activity. See the attached exhibit for additional information. Closure of these lanes will cause an inconvenience to the residents and traveling public along both Denton Tap and Bethel Road. We understand this, and the contractor has agreed to complete this work during the remainder of the summer, when our traffic patterns are lighter, in order to minimize this impact. This work accomplishes both the widening of the intersection, and the replacement of the bands of brick pavers with stamped concrete. Approval of this resolution will allow the contractor to move forward with the work within Denton Tap associated with the Bethel Road reconstruction project. Staff will be available to answer any questions at the City Council meeting. ìÊÍÌÍÉרðÛÎ×ùÐÍÉÇÊ× ú×ÈÔ×ÐêØê×ùÍÎÉÈÊÇÙÈÓÍÎ ùÓÈÃÍÖùÍÌÌ×ÐÐìÊÍÒ×ÙÈéè  û 1/21 0 1 INCH = 1 MILE 1/2 Created on: 7 July 2010 by Scott Latta Created in LDDT S:\CAD\In_Design\MISC EXHIBITS\dwg\EXHIBITS.dwg\ST03-01A CLOSURE 2 ìÊÍÌÍÉרðÛÎ×ùÐÍÉÇÊ× ú×ÈÔ×ÐêØê×ùÍÎÉÈÊÇÙÈÓÍÎ î÷åùíîéèêçùèóíî ùÓÈÃÍÖùÍÌÌ×ÐÐìÊÍÒ×ÙÈéè  û 2550 0 ûê÷ûíöìêíìíé÷ø 1 INCH = FT. 50 2/2 êíûøùðíéçê÷ Created on: 7 July 2010 by Scott Latta Created in LDDT S:\CAD\In_Design\MISC EXHIBITS\dwg\EXHIBITS.dwg\ST03-01A CLOSURE 2 RESOLUTION NO. ,240/6 -. 0 72 7. 1 A RESOLUTION OF THE CITY OF COPPELL, TEXAS AUTHORIZING THE CITY ENGINEER TO REDUCE DENTON TAP ROAD TO ONE LANE NORTHBOUND AND ONE LANE SOUTHBOUND FOR A PERIOD OF UP TO 40 CALENDAR DAYS FROM THE BEGINNING OF WORK; PROVIDING FOR A PENALTY FOR ROAD CLOSURE BEYOND 40 CALENDAR DAYS; PROVIDING FOR A BONUS AWARD FOR COMPLETION AND ROAD RE- OPENING IN LESS THAN 30 CALENDAR DAYS; AND AUTHORIZING THE MAYOR TO SIGN AND EXECUTE ANY NECESSARY DOCUMENTS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, Bethel Road at the intersection of Denton Tap Road is planned to undergo reconstruction with the construction of Bethel Road from Denton Tap to Penfolds; and WHEREAS, during the period of said reconstruction, traffic on the street and intersection will be severely impaired; and WHEREAS, reconstruction of the intersection within the existing right -of -way requires closure of two lanes of Denton Tap Road at the Bethel Road intersection; and WHEREAS, the Contractor shall maintain one lane northbound and one lane southbound of Denton Tap Road; and WHEREAS, after consideration the City Council has determined that it would be in the best interest of the City and its citizens to provide for a more expedient and safer reconstruction process by permitting the reduction of Denton Tap to one lane northbound and one lane southbound at the intersection during the period of reconstruction; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION 1. That the City Engineer and Contractor is hereby authorized to undertake the necessary steps to reduce Denton Tap to one lane northbound and one lane southbound for a period of 40 calendar days. 1 SECTION 2. That the Contractor is authorized and directed to cause the erection of signs and official traffic control devices as is necessary and to give notice of alternate routes of travel as provided herein. SECTION 3. That this Resolution shall take effect immediately from and after its passage as the law and charter in such cases provide. DULY PASSED by the City Council of the City of Coppell, Texas, this the 27 of 2010. APPROVED: A// BOB MAHALIK, MAYOR PRO TEM ATTEST: /2(.1/4- LIBB BALL, C SECRETAR APPROVE A0 1 • S TO FORM: ROBERT E. MCA. TY ATTORNEY 2