Sales Tax 09-AG100727AGENDA REQUEST FORM T H E.` 1 T Y. a F DEPT: Engineering COPPELL �` DATE July 27, 2010 � ITEM #: 1 F1 WORK SESSION 1:1 CONSENT 0 REGULAR ITEM TYPE CONTRACT /BID or PROPOSAL ITEM CAPTION: Consider approval of award of Bid #Q- 0710 -01 for the Tax 2009 street reconstruction project in the amount of $1,202,180 to RKM Utilities for construction of Heartz Road and Clear Creek Lane, and in the amount of $337,835 to Conatser Construction for construction of Dobecka Drive, as provided for in IMF funds; and authorizing the City Manager to sign and execute any necessary documents. GOAL(S): EXECUTIVE SUMMARY: Award of this bid will allow the City of Coppell to reconstruct residential streets using our 1/4 cent sales tax allocation. Staff will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: Funds are available from the 1/4 cent sales tax for street maintenance for these contracts. RECOMMENDED ACTION: ACTION TAKEN BY COUNCIL: Staff recommends approval of this Contract. APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve Vote - 5 -0 -2 Brancheau & Faught abstained (counts as an affirmative vote - Home Rule Charter 3.11) M - Franklin S Hunt Libby Ball 2010.07.31 1011:27 - 05'00' 1 # 1/4 Cent Sales Tax Award MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: July 27, 2010 RE: Consider approval of award of Bid #Q- 0710 -01 for the Tax 2009 street reconstruction project in the amount of $1,202,180 to RIM Utilities for construction of Heartz Road and Clear Creek Lane, and in the amount of $337,835 to Conatser Construction for construction of Dobecka Drive, as provided for in IMF funds; and authorizing the City Manager to sign and execute any necessary documents. On July 8, 2010 the City of Coppell received and opened eight bids for the reconstruction of the Tax 2009 streets which consist of Heartz Road, Clear Creek Lane, and Dobecka Drive. The bid was set up such that contractors could submit bids for each individual street, and a total bid for all three streets. All eight contractors submitted bids for all options. Total bids ranged from $1,423,792.50 to $1,711,172.75. The engineering firm of Teague Nall and Perkins prepared the bidding documents, and estimated the cost at $1,650,000. This project represents our first major effort to reconstruct residential streets using our 1 /4 cent sales tax allocation. All three of these streets have had a history of street or utility failures that have required considerable maintenance effort and expense. Water, sewer, paving, and sidewalks will be replaced on all streets. In evaluation of the bids received it was noted that RKM Utilities submitted the lowest bid for Heartz Road, Clear Creek Lane, and the total for all three streets. Conatser Construction submitted the lowest bid for Dobecka Drive, and the combination of RKM's bids for Heartz and Clear Creek plus the Conatser bid for Dobecka was lower than RKM's total bid for all three streets. Based on this analysis we believe it is in the best interest to the city to award these three streets to the two contractors. The design engineer has reviewed the bids and performed background investigation on both contractors. Both contractors have performed many projects of similar size and scope. The engineer has recommended these contractors for award based on their investigation, and we support this recommendation. The award amounts include a maximum bonus of $40,000 for early completion for each street. The bonus amount is based on a value of $1,000 per calendar day, and will only be paid to the contractor if it is earned under the terms of the contract. The contract allows for 150 calendar days to complete Heartz, 180 calendar days to complete Clear Creek, and 120 Calendar days to complete Dobecka. Upon award of the contract the engineering department will schedule a public meeting with the adjacent residents to discuss impacts to them during construction. Staff recommends the award of the Tax 2009 street reconstruction project in the amount of $1,202,180 to RKM Utilities for construction of Heartz Road and Clear Creek Lane, and in the amount of $337,835 to Conatser Construction for construction of Dobecka Drive, as provided for in IMF funds; and authorizing the City Manager to sign and execute any necessary documents. Staff will be available to answer any questions at the council meeting. Zr P TE 4GUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning July 19, 2010 Mr. Keith Marvin, P.E. Project Engineer City of Coppeil 255 E. Parkway Blvd. Coppeli, Texas 75019 RE: 2409 Tax Streets: S. Heartz Road, Dobecka Drive, Ctear Creek Lane Gear Keith, As you Know, bids were opened on July 8, 2010 for the above referenced project, and bid tabulations have been prepared documenting the seven bids. After careful examination of the bid documents, there were no errors that affected the results of the bids as they were read. One discrepancy was noted in one of the higher bids as indicated in the attached bid tabulations. The 2009 Tax Streets project was bid in such a way that the City has the option to award multiple contractors based on the low bid on each street or a lower total overall bid. The low bidders on each of the streets and the overall project are as follows. - S. Heartz Read — RKM Utility Services, Inc. ($ 534,582.50) - Dobecka Drive — Conatser Construction, TIC L.P. ($ 297,835.00 - Clear Creek Lane — RKM Utility Services, Inc. ($ 587,597.50) - Total bid for all three streets— RKM Utility Services, Inc. ($ 1 ,423,792.50) TNP has contacted both RKM Utility Services, Inc. and Conatser Construction, TX L.P. and received information regarding each company's past and present experience, as well as the type of equipment available. We have also contacted representatives from each of the companies to further discuss the scope of the project and the potential award of contract. RKM Utility Services, Inc. provided a list of public sector projects in many cities in the area. All of the references that were contacted responded positively_ One reference stated that RKM had previously been awarded two additional contracts in the City, and they would continue to work with this company. i have further discussed the scope of the project with Mr. Dennis Gulley at RKM, and I believe that he provided a bid in good faith and understanding of the project. 12160 North Abrarns Roan, Suite 508 Dallas, Texas 75243 214.161.9867 phone 214.461.9864 fax www. tnp-onitne. com Conatser Construction provided with their reference information a letter further detailing their project breakdown and company size. It appears that they work in both the public and private sector with a majority of the work being on the public side. Conatser is well known in the private sector as being a contractor that performs the project well and quickly completes the job. I have further discussed the scope of the project with Russ Sigman at Conatser, and I believe that he provided a bid in good faith and understanding of the project. It is my understanding that the City would prefer to award the project on a "per street bid" basis and not as an overall contract to one contractor. The results of the bids received allow for the project to be divided among two contractors and remain awarded to the low bidder for each street. Based on the information provided by the low bidders and obtained during TNP's research, it appears that the following construction contracts should be awarded. Not included in the below contract amounts is the potential incentive award of up to $40,000 per street for a total of up to $ 120,000. - S. Heartz Road — RKM Utility Services, Inc. ($ 534,582.50) - Dobecka Drive — Conatser Construction, TX L.P. ($ 297,835.00) - Clear Creek Lane — RKM Utility Services, Inc. ($ 587,597.50) Not included in the above contract amounts is the potential incentive award of up to $40,000 per street for a total of up to $ 120,000 for the total project. This incentive amount would be for early completion of the project based on the projected number of days needed for the completion of each street as stated in the bid documents. Please feel free to call me if you have any questions regarding this information. Sincerely, TEAGUE NALL AND PERKINS, INC. 4 Chris Seely, P.E. TEAGUE HALL AND PERKINS BID TABULATION REPORT CLIENT: CITY OF COPPELL DESCRIPTION: 2009 STREET RECONSTRUCTION - S. HEARTZ ROAD, DOBECKA DRIVE, CLEAF TNP JOB NO: CPL09132 ENGINEER'S ESTIMATE: $1,650,000 BIDDERS BID DATE: JULY 8, 2010 BID TIME: 2:00 PM RKM Utility Services, Inc. Conatser Construction Jim Bowman Construction Co. J & T Excavating ITEM NO. DESCRIPTION OF ITEMS QUANTITY UNIT UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TO S. HEARTZ ROAD 101 MOBILIZATION 1 LS $7,500.00 $7,500.00 $3,000.00 $3,000.00 $23,050.00 $23,050.00 $21,600.00 $; 102 PROJECT SIGNS 2 EA $500.00 $1,000.00 $500.00 $1,000.00 $600.00 $1,200.00 $400.00 103 RIGHT -OF -WAY PREPARATION 1 LS $3,000.00 $3,000.00 $2,000.00 $2,000.00 $2,900.00 $2,900.00 $18,000.00 $ 104 REMOVE EX. CONCRETE PAVEMENT 5300 SY $7.60 $40,280.00 $4.00 $21,200.00 $5.70 $30,210.00 $5.50 $; 105 REMOVE EX. CONCRETE DRIVEWAYS & SIDEWALKS 1500 SY $6.50 $9,750.00 $5.00 $7,500.00 $5.70 $8,550.00 $5.50 106 8" LIME TREATED SUBGRADE TREATMENT 5000 SY $3.55 $17,750.00 $3.50 $17,500.00 $3.00 $15,000.00 $2.30 $ 107 HYDRATED LIME (40 LB /SY) 100 TON $100.00 $10,000.00 $160.00 $16,000.00 $140.00 $14,000.00 $128.00 $ 108 6" REINFORCED CONCRETE PAVEMENT WITH CURB 0 SY $30.25 $0.00 $36.00 $0.00 $0.00 109 8" REINFORCED CONCRETE PAVEMENT WITH CURB 4700 SY $36.00 $169,200.00 $38.50 $180,950.00 $41.00 $192,700.00 $38.00 $1' 110 6" REINFORCED DRIVEWAY /ALLEY PAVEMENT 700 SY $34.00 $23,800.00 $60.00 $42,000.00 $41.30 $28,910.00 $45.00 $. 111 REPAIR /REPLACE EX. AGGREGATE DRIVEWAY 0 SY $46.00 $0.00 $75.00 $0.00 $0.00 112 4" CONCRETE SIDEWALK 950 SY $24.75 $23,512.50 $27.00 $25,650.00 $29.30 $27,835.00 $30.00 $; 113 BARRIER FREE RAMP 8 EA $1,000.00 $8,000.00 $1,000.00 $8 $400.00 $3,200.00 $600.00 114 VARIABLE HEIGHT RET. WALL W /INTEGRAL SIDEWALK 300 LF $32.00 $9,600.00 $30.00 $9,000.00 $57.00 $17,100.00 $40.00 $ 115 CONCRETE SIDEWALK STEPS 14 EA $300.00 $4,200.00 $300.00 $4,200.00 $350.00 $4,900.00 $250.00 116 PAVEMENT MARKINGS 1 LS $1,000.00 $1,000.00 $4,000.00 $4,000.00 $4,850.00 $4,850.00 $800.00 117 TRAFFIC BUTTONS 1 LS $6 $6,000.00 $8,000.00 $8,000.00 $3 $3,920.00 $5 118 FURNISH, INSTALL, MAINTAIN TRAFFIC CONTROL DEV. 1 LS $4 $4,000.00 $5,000.00 $5 $4 $4,200.00 $8 119 FURNISH, INST., MAINT., REMOVE EROSION CONTROL 1 LS $2,250.00 $2,250.00 $1,500.00 $1 $1,500.00 $1,500.00 $3,200.00 120 RESTORE PARKWAYS & DISTURBED AREAS 1 LS $2,800.00 $2,800.00 $20,000.00 $20,000.00 $650.00 $650.00 $7,200.00 121 5' CURB INLET 2 EA $1,800.00 $3 $1,500.00 $3 $2,500.00 $5,000.00 $2,000.00 122 10' CURB INLET 1 EA $2,500.00 $2 $2,200.00 $2,200.00 $3,000.00 $3,000.00 $2,550.00 123 5' INLET TOP RECONSTRUCTION 2 EA $1 $2 $1 $2 $1,650.00 $3,300.00 $1 124 10' INLET TOP RECONSTRUCTION 3 EA $1,600.00 $4 $1 $4 $1,950.00 $5,850.00 $1 125 18" REINFORCED CONCRETE PIPE (CL III) 0 LF $46.00 $0.00 $35.00 $0.00 $0.00 126 21" REINFORCED CONCRETE PIPE (CL III) 0 LF $52.00 $0.00 $40.00 $0.00 $0.00 127 24" REINFORCED CONCRETE PIPE (CL III) 0 LF $58.00 $0.00 $50.00 $0.00 $0.00 128 4'x4' SQUARE STORM DRAIN MANHOLE 0 EA $3,100.00 $0.00 $2,500.00 $0.00 $0.00 129 6" PVC C -900 DR -18 WATER LINE 100 LF $53.00 $5,300.00 $28.00 $2 $24.00 $2 $28.50 130 8" PVC C -900 DR -18 WATER LINE 1200 LF $40.00 $48,000.00 $30.00 $36,000.00 $31.00 $37 $32.00 $ 131 WATER SERVICE W/ METER CAN (SHORT SIDE) 0 EA $670.00 $0.00 $800.00 $0.00 $0.00 132 WATER SERVICE W/ METER CAN (LONG SIDE) 14 EA $935.00 $13 $1,200.00 $16,800.00 $1,380.00 $19,320.00 $1,040.00 $ 133 6" TAPPING SLEEVE AND VALVE 0 EA $2,225.00 $0.00 $2,500.00 $0.00 $0.00 134 8" TAPPING SLEEVE AND VALVE 1 EA $2,650.00 $2 $3 $3 $2,475.00 $2,475.00 $3 135 12 "x 8" TAPPING SLEEVE AND VALVE 0 EA $3,200.00 $0.00 $4 $0.00 $0.00 136 6" GATE VALVE 6 EA $900.00 $5 $800.00 $4 $855.00 $5,130.00 $960.00 137 8" GATE VALVE 7 EA $1 $8 $900.00 $6 $1 $8 $1 138 SALVAGE & RELOCATE FIRE HYDRANT AND VALVE 3 EA $900.00 $2 $3,500.00 $10 $2 $7 $1 139 INSTALL NEW FIRE HYDRANT AND VALVE ASSEMBLY 2 EA $2 $5 $3,000.00 $6 $2 $4 $2 140 ADJUST EXISTING VALVE BOX TO GRADE 0 EA $100.00 $0.00 $100.00 $0.00 $0.00 141 ABANDON EXISTING WATER LINE 1 LS $1 $1 $1 $1 $500.00 $500.00 $900.00 142 8" PVC SDR -35 SANITARY SEWER PIPE 1300 LF $30.50 $39 $40.00 $52 $32.50 $42,250.00 $36.00 $ 143 4' SANITARY SEWER MANHOLE (ALL DEPTHS) 3 EA $2 $8 $2,500.00 $7 1 $2,780.00 $8,340.001 $37200.00 TEAGUE HALL AND PERKINS BID TABULATION REPORT CLIENT: CITY OF COPPELL DESCRIPTION: 2009 STREET RECONSTRUCTION - S. HEARTZ ROAD, DOBECKA DRIVE, CLEAF TNP JOB NO: CPL09132 ENGINEER'S ESTIMATE: $1,650,000 BIDDERS BID DATE: JULY 8, 2010 BID TIME: 2:00 PM RKM Utility Services, Inc. Conatser Construction Jim Bowman Construction Co. J & T Excavating ITEM NO. DESCRIPTION OF ITEMS QUANTITY UNIT UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TO DOBECKA DRIVE 101 MOBILIZATION 1 LS $7,500.00 $7,500.00 $2,000.00 $2,000.00 $21,300.00 $21,300.00 $11,800.00 $ 102 PROJECT SIGNS 1 EA $500.00 $500.00 $500.00 $500.00 $600.00 $600.00 $400.00 103 RIGHT -OF -WAY PREPARATION 1 LS $3,100.00 $3,100.00 $1,000.00 $1,000.00 $3,500.00 $3,500.00 $10,400.00 $ 104 REMOVE EX. CONCRETE PAVEMENT 2500 SY $8.00 $20,000.00 $4.00 $10,000.00 $6.05 $15,125.00 $5.50 $ 105 REMOVE EX. CONCRETE DRIVEWAYS & SIDEWALKS 1600 SY $6.50 $10,400.00 $5.00 $8,000.00 $6.05 $9,680.00 $5.50 106 8" LIME TREATED SUBGRADE TREATMENT 0 SY $3.55 $0.00 $3.50 $0.00 $0.00 107 HYDRATED LIME (40 LB /SY) 0 TON $100.00 $0.00 $160.00 $0.00 $0.00 108 6" REINFORCED CONCRETE PAVEMENT WITH CURB 0 SY $32.00 $0.00 $36.00 $0.00 $0.00 109 8" REINFORCED CONCRETE PAVEMENT WITH CURB 2600 SY $42.00 $109,200.00 $42.00 $109,200.00 $43.50 $113,100.00 $39.00 $1 110 6" REINFORCED DRIVEWAY /ALLEY PAVEMENT 260 SY $36.00 $9,360.00 $60.00 $15,600.00 $41.00 $10,660.00 $48.00 $ 111 REPAIR /REPLACE EX. AGGREGATE DRIVEWAY 55 SY $48.50 $2,667.50 $75.00 $4,125.00 $65.00 $3,575.00 $85.00 112 4" CONCRETE SIDEWALK 1220 SY $26.00 $31,720.00 $27.00 $32,940.00 $32.00 $39,040.00 $32.00 $ 113 BARRIER FREE RAMP 0 EA $1,250.00 $0.00 $1,000.00 $0.00 $0.00 114 VARIABLE HEIGHT RET. WALL W /INTEGRAL SIDEWALK 0 LF $33.00 $0.00 $30.00 $0.00 $0.00 115 CONCRETE SIDEWALK STEPS 0 EA $320.00 $0.00 $300.00 $0.00 $0.00 116 PAVEMENT MARKINGS 0 LS $1,000.00 $0.00 $2,000.00 $0.00 $0.00 117 TRAFFIC BUTTONS 1 LS $6,000.00 $6,000.00 $1,000.00 $1,000.00 $880.00 $880.00 $320.00 118 FURNISH, INSTALL, MAINTAIN TRAFFIC CONTROL DEV. 1 LS $2,800.00 $2,800.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 119 FURNISH, INST., MAINT., REMOVE EROSION CONTROL 1 LS $3,000.00 $3,000.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,500.00 120 RESTORE PARKWAYS & DISTURBED AREAS 1 LS $4,000.00 $4,000.00 $5,000.00 $5,000.00 $550.00 $550.00 $6,200.00 121 5' CURB INLET 0 EA $2,000.00 $0.00 $1,500.00 $0.00 $0.00 122 10' CURB INLET 0 EA $2,500.00 $0.00 $2,200.00 $0.00 $0.00 123 5' INLET TOP RECONSTRUCTION 0 EA $1,100.00 $0.00 $1,000.00 $0.00 $0.00 124 10' INLET TOP RECONSTRUCTION 2 EA $1,600.00 $3,200.00 $1,500.00 $3,000.00 $1,950.00 $3,900.00 $1,600.00 125 18" REINFORCED CONCRETE PIPE (CL III) 0 LF $46.00 $0.00 $35.00 $0.00 $0.00 126 21" REINFORCED CONCRETE PIPE (CL III) 0 LF $52.00 $0.00 $40.00 $0.00 $0.00 127 24" REINFORCED CONCRETE PIPE (CL III) 0 LF $58.00 $0.00 $50.00 $0.00 $0.00 128 4'x4' SQUARE STORM DRAIN MANHOLE 0 EA $3,100.00 $0.00 $2,500.00 $0.00 $0.00 129 6" PVC C -900 DR -18 WATER LINE 20 LF $39.50 $790.00 $28.00 $560.00 $23.00 $460.00 $30.00 130 8" PVC C -900 DR -18 WATER LINE 750 LF $41.70 $31,275.00 $30.00 $22,500.00 $33.50 $25,125.00 $31.00 $; 131 WATER SERVICE W/ METER CAN (SHORT SIDE) 8 EA $670.00 $5,360.00 $800.00 $6,400.00 $880.00 $7,040.00 $875.00 132 WATER SERVICE W/ METER CAN (LONG SIDE) 7 EA $950.00 $6,650.00 $1,200.00 $8,400.00 $1,225.00 $8,575.00 $1,040.00 133 6" TAPPING SLEEVE AND VALVE 0 EA $2,300.00 $0.00 $2,500.00 $0.00 $0.00 134 8" TAPPING SLEEVE AND VALVE 0 EA $2,650.00 $0.00 $3,500.00 $0.00 $0.00 135 12 "x 8" TAPPING SLEEVE AND VALVE 0 EA $3,200.00 $0.00 $4,000.00 $0.00 $0.00 136 6" GATE VALVE 2 EA $900.00 $1,800.00 $800.00 $1,600.00 $855.00 $1,710.00 $960.00 137 8" GATE VALVE 2 EA $1,250.00 $2,500.00 $900.00 $1,800.00 $1,195.00 $2,390.00 $1,050.00 138 SALVAGE & RELOCATE FIRE HYDRANT AND VALVE 1 EA $1,000.00 $1,000.00 $3,500.00 $3,500.00 $2,600.00 $2,600.00 $1,800.00 139 INSTALL NEW FIRE HYDRANT AND VALVE ASSEMBLY 1 EA $2,600.00 $2,600.00 $3,000.00 $3,000.00 $2,415.00 $2,415.00 $2,200.00 140 ADJUST EXISTING VALVE BOX TO GRADE 0 EA $100.00 $0.00 $100.00 $0.00 $0.00 141 ABANDON EXISTING WATER LINE 1 LS $1,000.00 $1,000.00 $1,000.00 $1,000.00 $500.00 $500.00 $900.00 142 8" PVC SDR -35 SANITARY SEWER PIPE 0 LF $31.50 $0.00 $40.00 $0.00 $0.00 143 4' SANITARY SEWER MANHOLE (ALL DEPTHS) 2 EA $2,500.00 $5,000.001 $2,500.001 $5 1 $3,260.001 $6,520.001 $37200.00 TEAGUE HALL AND PERKINS BID TABULATION REPORT CLIENT: CITY OF COPPELL DESCRIPTION: 2009 STREET RECONSTRUCTION - S. HEARTZ ROAD, DOBECKA DRIVE, CLEAF TNP JOB NO: CPL09132 ENGINEER'S ESTIMATE: $1,650,000 BIDDERS BID DATE: JULY 8, 2010 BID TIME: 2:00 PM RKM Utility Services, Inc. Conatser Construction Jim Bowman Construction Co. J & T Excavating ITEM NO. DESCRIPTION OF ITEMS QUANTITY UNIT UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TO CLEAR CREEK LANE 101 MOBILIZATION 1 LS $7,500.00 $7,500.00 $2,000.00 $2,000.00 $24,600.00 $24,600.00 $25,500.00 $; 102 PROJECT SIGNS 2 EA $500.00 $1,000.00 $500.00 $1,000.00 $600.00 $1,200.00 $400.00 103 RIGHT -OF -WAY PREPARATION 1 LS $2,100.00 $2,100.00 $1,000.00 $1,000.00 $3,250.00 $3,250.00 $21,600.00 $; 104 REMOVE EX. CONCRETE PAVEMENT 5100 SY $7.60 $38,760.00 $4.00 $20,400.00 $5.70 $29,070.00 $5.50 $; 105 REMOVE EX. CONCRETE DRIVEWAYS & SIDEWALKS 1400 SY $6.50 $9,100.00 $5.00 $7,000.00 $5.70 $7,980.00 $5.50 106 8" LIME TREATED SUBGRADE TREATMENT 5400 SY $3.55 $19,170.00 $3.50 $18,900.00 $3.00 $16,200.00 $2.30 $ 107 HYDRATED LIME (40 LB /SY) 108 TON $100.00 $10,800.00 $160.00 $17,280.00 $140.00 $15,120.00 $128.00 $ 108 6" REINFORCED CONCRETE PAVEMENT WITH CURB 5100 SY $32.50 $165,750.00 $36.00 $183,600.00 $35.50 $181,050.00 $31.50 $11 109 8" REINFORCED CONCRETE PAVEMENT WITH CURB 0 SY $39.00 $0.00 $38.50 $0.00 $0.00 110 6" REINFORCED DRIVEWAY /ALLEY PAVEMENT 30 SY $36.00 $1,080.00 $60.00 $1,800.00 $45.00 $1,350.00 $70.00 111 REPAIR /REPLACE EX. AGGREGATE DRIVEWAY 0 SY $49.00 $0.00 $75.00 $0.00 $0.00 112 4" CONCRETE SIDEWALK 1380 SY $26.00 $35,880.00 $27.00 $37,260.00 $30.00 $41,400.00 $32.00 $- 113 BARRIER FREE RAMP 6 EA $1,000.00 $6,000.00 $1,000.00 $6,000.00 $400.00 $2,400.00 $600.00 114 VARIABLE HEIGHT RET. WALL W /INTEGRAL SIDEWALK 0 LF $34.00 $0.00 $30.00 $0.00 $0.00 115 CONCRETE SIDEWALK STEPS 0 EA $320.00 $0.00 $300.00 $0.00 $0.00 116 PAVEMENT MARKINGS 0 LS $1,000.00 $0.00 $2,000.00 $0.00 $0.00 117 TRAFFIC BUTTONS 0 LS $6,200.00 $0.00 $1,000.00 $0.00 $0.00 118 FURNISH, INSTALL, MAINTAIN TRAFFIC CONTROL DEV. 1 LS $2,800.00 $2,800.00 $4,000.00 $4,000.00 $5,100.00 $5,100.00 $9,000.00 119 FURNISH, INST., MAINT., REMOVE EROSION CONTROL 1 LS $2,200.00 $2,200.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $3,900.00 120 RESTORE PARKWAYS & DISTURBED AREAS 1 LS $2,800.00 $2,800.00 $10,000.00 $10,000.00 $920.00 $920.00 $11,900.00 $ 121 5' CURB INLET 3 EA $1,725.00 $5,175.00 $1,500.00 $4,500.00 $2,300.00 $6,900.00 $2,000.00 122 10' CURB INLET 0 EA $2,475.00 $0.00 $2,200.00 $0.00 $0.00 123 5' INLET TOP RECONSTRUCTION 0 EA $1,100.00 $0.00 $1,000.00 $0.00 $0.00 124 10' INLET TOP RECONSTRUCTION 1 EA $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,950.00 $1,950.00 $1,600.00 125 18" REINFORCED CONCRETE PIPE (CL III) 60 LF $46.25 $2,775.00 $35.00 $2,100.00 $39.50 $2,370.00 $35.00 126 21" REINFORCED CONCRETE PIPE (CL III) 390 LF $52.25 $20,377.50 $40.00 $15,600.00 $43.00 $16,770.00 $38.00 $ 127 24" REINFORCED CONCRETE PIPE (CL III) 75 LF $58.00 $4,350.00 $50.00 $3,750.00 $48.00 $3,600.00 $43.00 128 4'x4' SQUARE STORM DRAIN MANHOLE 1 EA $3,100.00 $3,100.00 $2,500.00 $2,500.00 $3,500.00 $3,500.00 $3,200.00 129 6" PVC C -900 DR -18 WATER LINE 50 LF $39.50 $1,975.00 $28.00 $1,400.00 $29.00 $1,450.00 $30.00 130 8" PVC C -900 DR -18 WATER LINE 1560 LF $38.00 $59,280.00 $30.00 $46,800.00 $30.00 $46,800.00 $31.00 $ 131 WATER SERVICE W/ METER CAN (SHORT SIDE) 23 EA $700.00 $16,100.00 $800.00 $18,400.00 $835.00 $19,205.00 $875.00 $; 132 WATER SERVICE W/ METER CAN (LONG SIDE) 17 EA $1,000.00 $17,000.00 $1,200.00 $20,400.00 $1,170.00 $19,890.00 $1,040.00 $ 133 6" TAPPING SLEEVE AND VALVE 1 EA $2,300.00 $2,300.00 $2,500.00 $2,500.00 $2,080.00 $2,080.00 $3,000.00 134 8" TAPPING SLEEVE AND VALVE 0 EA $2,700.00 $0.00 $3,500.00 $0.00 $0.00 135 12 "x 8" TAPPING SLEEVE AND VALVE 1 EA $3,300.00 $3,300.00 $4,000.00 $4,000.00 $2,700.00 $2,700.00 $4,500.00 136 6" GATE VALVE 4 EA $900.00 $3,600.00 $800.00 $3,200.00 $855.00 $3,420.00 $690.00 137 8" GATE VALVE 5 EA $1,300.00 $6,500.00 $900.00 $4,500.00 $1,215.00 $6,075.00 $1,050.00 138 SALVAGE & RELOCATE FIRE HYDRANT AND VALVE 2 EA $1,000.00 $2,000.00 $3,500.00 $7,000.00 $2,600.00 $5,200.00 $1,800.00 139 INSTALL NEW FIRE HYDRANT AND VALVE ASSEMBLY 2 EA $2,700.00 $5,400.00 $3,000.00 $6,000.00 $2,400.00 $4,800.00 $2,200.00 140 ADJUST EXISTING VALVE BOX TO GRADE 0 EA $100.00 $0.00 $100.00 $0.00 $0.00 141 ABANDON EXISTING WATER LINE 1 LS $1,725.00 $1,725.00 $1,000.00 $1,000.00 $500.00 $500.00 $750.00 142 8" PVC SDR -35 SANITARY SEWER PIPE 1470 1 LF $32.501 $47,775.00 $40.00 $58,800.00 $31.00 $45,570.00 $36.00 $; 143 4' SANITARY SEWER MANHOLE (ALL DEPTHS) 5 EA $2,600.00 $13,000.00 $2,500.00 $12,500.00 $2,685.00 $13,425.00 1 $3,200.00 $ TEAGUE NALL AND PERKINS BID TABULATION REPORT CLIENT: CITY OF COPPELL DESCRIPTION: 2009 STREET RECONSTRUCTION - S. HEARTZ ROAD, DOBECKA DRIVE, CLEAF TNP JOB NO: CPL09132 ENGINEER'S ESTIMATE: $1.650.000 BIDDERS BID DATE: JULY 8, 2010 BID TIME: 2:00 PM RKM Utility Services, Inc. Conatser Construction Jim Bowman Construction Co. J & T Excavating ITEM NO. DESCRIPTION OF ITEMS QUANTITY UNIT UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TO SUBTOTAL S. HEARTZ ROAD $534,582.50 $574,800.00 $581,235.00 $57 SUBTOTAL DOBECKA DRIVE $301,612.50 $297,835.00 $338,957.50 $31 SUBTOTAL CLEAR CREEK LANE $587,597.50 $625,490.00 $606,685.00 $64 TOTAL OF SUBTOTAL BIDS $1,423,792.50 $1,498,125.00 $1,526,877.50 $1,53 MINUS DEDUCTION FOR AWARD OF ALL 3 STREETS $0.00 $5,000.00 $0.00 TOTAL BID FOR ALL 3 STREETS $1,423,792.50 $1,493,125.00 $1,526,877.50 $1,53 * The contract includes a potential bonus of $40,000 for early completion of each street for a total of $120,000. The bonus will only be paid if earned under the terms of the contract