Loading...
ST0301A-CS100722 (3) Page 1 of 1 Keith Marvin - Bethel Rd - Shut Down on job as of 2:30pm From:   "Dean Dumke" <deand@JRJPaving.com> To:   "Keith Marvin" <KMARVIN@coppelltx.gov> Date:   7/22/2010 6:42 PM Subject:   Bethel Rd - Shut Down on job as of 2:30pm CC:"Caleb Thornhill" <bct@freese.com>, "Marty Murphy" <Martym@JRJPaving.com>, "Kim     Entrekin" <Kime@JRJPaving.com>   Keith,   This afternoon there was meetings held on site with Caleb Thornhill, Larry Davis, Lance Proctor the Chateau Developer, Terry Wade JRJ Survey, and myself regarding the grades from Chateau to Denton Tap.  There ia approximately 18” from top of curb to existing.  JRJ has excavated to subgrade and was ready to lime tomorrow on both sides of the existing roadway from the intersection of Denton Tap to Chateau.  Due to the grades per plan being so drastic in this area and Freese & Nichols needing time to look at shots Caleb requested and given to him today at the locations he requested, JRJ was instructed to cancel lime and were shut down from working in this area.  By being shut down in this area, this drastically impacts the time on this job due to if we could have limed tomorrow, we could have remixed on Monday with the potential of pouring out limed area from Denton Tap to Chateau on Wednesday next week.   Just not being able to lime tomorrow has already cost JRJ and the job 3 days.  I know that Caleb will be working diligently on getting this resolved, but will also need time to recalculate new information once received so that we can determine what needs to be performed.  Note, all franchise utilities have been moved to the location under the sidewalk that is approximately 18” too high.  If it is determined to lower sidewalk, to make existing grades work, the potential of franchise utility conflict is high.   Cordially,   Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________       file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C489111City_o...8/19/2010