ST0301A-CN1008032010) Keith Marvin -Fwd: Bethel Road II - Proposed Excavation Change Order Page 1
From: Keith Marvin
To: Thornhill, Caleb
CC: Hatley, Tricia
Date: 8/3/2010 4:51 PM
Subject: Fwd: Bethel Road II - Proposed Excavation Change Order
Attachments: nevi I (copier @j rj pavi ng .com_20100803_090116. pdf
Do you have any thoughts on this proposal?
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304 -3681
>>> "Butch Cross" < butchc @JRJPaving.com 8/3/2010 4:21 PM >>>
Keith,
Here is the proposed change order for Bethel Road. The pricing looks
high so I broke out the equipment rates, which
I included the mobilization for two different locations. Please call if
you have any questions
Thanks,
Butch Cross
JRJPAVING, L.P.
Proposed Change Order 8
DATE: 8/312010
TO:
City of Coppell
PROPOSAL FOR: Bethel Rd II
ATTN:
Keith Marvin
BULLETIN ONE PRICING
Item
Description
Unit
Quanti
Unit Price
Total Amount
Station Original Grade
New Grade
Difference
Average
1
50 +50
503.64
504.41
0.77
0.8
CY
83
$
21.95
$ 1,821.04
2
51+00
501.93
502.76
0.83
0.725
CY
75
$
21.95
$ 1,650.31
3
51+50
500.1
500.72
0.62
0.38
CY
39
$
21.95
$ 864.99
4
52 +00
498.53
498.67
0.14
0.065
CY
7
$
21.95
$ 147.96
5
52 +50
497.06
497.05
-0.01
-0.005
CY
-1
$
21.95
$ (11.38)
6
53+00
495.95
495.95
0
$ 4,472.92
Note: Width based on 19.5' +5' for Parkway & 26.5'+ 5' Parkway = 56' total excavation 56
50 Stations 50
Total Lenth x Width / 27 103.703704
Total Calculated In Place C.Y. = 204 CY
Truck Yards = 270 CY
2- 963 TracK Loaders @ $105.. Hr. X 8
1 - Motorgrader @ $70.00 Hr. X 8
1 - 815 Compactor @ $123.50 Hr X 8
1-916 Water Truck @ $55 Hr X 8
Trucking - 270 CY @ $3.00
Total Site Improvements
$1,680.00
$560.00
$988.00
$440.00
$810.00
$4,478.00 Divided By 204 = $21.95 Per
These quantities are only for the two outside lanes excavated presently. There will be additional borrow when the center lanes are
constructed.
The fill bid item in the contract does not apply here as this is to process fills from onsite street excavation bid item.
Since there is not enough cuts onsite this material will have to be imported from offsite, therefore this is a borrow item not embankment.
We have bid this material to come from the City property off of Coppell Road, if this is not allowed please let us know so we can amend
our trucking cost. This cost cost does not include adding any silt fence or construction entrances at the borrow site, that will be
additional cost if required.
Should you have any questions or require additional information please feel free to call me.
Respectfully Submitted,
Butch Cross
Estimator
1805 ROYAL LANE, STE. 107 DALLAS, TX. 75229 Page 1 of 1 PH. 214 - 466 -8340 FAX 214- 466 -8354