Loading...
ST0301A-CN1008032010) Keith Marvin -Fwd: Bethel Road II - Proposed Excavation Change Order Page 1 From: Keith Marvin To: Thornhill, Caleb CC: Hatley, Tricia Date: 8/3/2010 4:51 PM Subject: Fwd: Bethel Road II - Proposed Excavation Change Order Attachments: nevi I (copier @j rj pavi ng .com_20100803_090116. pdf Do you have any thoughts on this proposal? Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "Butch Cross" < butchc @JRJPaving.com 8/3/2010 4:21 PM >>> Keith, Here is the proposed change order for Bethel Road. The pricing looks high so I broke out the equipment rates, which I included the mobilization for two different locations. Please call if you have any questions Thanks, Butch Cross JRJPAVING, L.P. Proposed Change Order 8 DATE: 8/312010 TO: City of Coppell PROPOSAL FOR: Bethel Rd II ATTN: Keith Marvin BULLETIN ONE PRICING Item Description Unit Quanti Unit Price Total Amount Station Original Grade New Grade Difference Average 1 50 +50 503.64 504.41 0.77 0.8 CY 83 $ 21.95 $ 1,821.04 2 51+00 501.93 502.76 0.83 0.725 CY 75 $ 21.95 $ 1,650.31 3 51+50 500.1 500.72 0.62 0.38 CY 39 $ 21.95 $ 864.99 4 52 +00 498.53 498.67 0.14 0.065 CY 7 $ 21.95 $ 147.96 5 52 +50 497.06 497.05 -0.01 -0.005 CY -1 $ 21.95 $ (11.38) 6 53+00 495.95 495.95 0 $ 4,472.92 Note: Width based on 19.5' +5' for Parkway & 26.5'+ 5' Parkway = 56' total excavation 56 50 Stations 50 Total Lenth x Width / 27 103.703704 Total Calculated In Place C.Y. = 204 CY Truck Yards = 270 CY 2- 963 TracK Loaders @ $105.. Hr. X 8 1 - Motorgrader @ $70.00 Hr. X 8 1 - 815 Compactor @ $123.50 Hr X 8 1-916 Water Truck @ $55 Hr X 8 Trucking - 270 CY @ $3.00 Total Site Improvements $1,680.00 $560.00 $988.00 $440.00 $810.00 $4,478.00 Divided By 204 = $21.95 Per These quantities are only for the two outside lanes excavated presently. There will be additional borrow when the center lanes are constructed. The fill bid item in the contract does not apply here as this is to process fills from onsite street excavation bid item. Since there is not enough cuts onsite this material will have to be imported from offsite, therefore this is a borrow item not embankment. We have bid this material to come from the City property off of Coppell Road, if this is not allowed please let us know so we can amend our trucking cost. This cost cost does not include adding any silt fence or construction entrances at the borrow site, that will be additional cost if required. Should you have any questions or require additional information please feel free to call me. Respectfully Submitted, Butch Cross Estimator 1805 ROYAL LANE, STE. 107 DALLAS, TX. 75229 Page 1 of 1 PH. 214 - 466 -8340 FAX 214- 466 -8354