Loading...
Sales Tax 09-PR090129The Engineer agrees to render services Project as outlined herein. The Basic Si includes design survey, and preparation elements: Topographic suney and deli 2. of the ) match current widths, and include standard or wherever possible, existing sidewalks shall 3, Significant drainage improvements will not be included in this project. However, 'NP shall evaluate adequacy of street capacities to determine if there may be a need for 10r L11UQ'011bUuUt1(J11 01 UUMLIU11M 11110 UDU UU1111CUL10,11 PIPCh. r-AINURP, 1111UL Wpb WM OU replaced, but design of new improvements is limited to extensions of existing pipes if an additional inlet is deemed necessary, within the limits of construction. Further design of drainage improvements shall be considered additional senliceq. 0 BASIC SERVICES: Engineer shall attend preliminary conferences with regarding the project and such other conferences as City so that the plans and specifications which are to ,yineer, will result in providing facilities which are 2. 'rho n' ineer shall attend such conferences with officials of other agencies including other engineering and/or surveying firms under contract with the City, as may be necessary in the opinion of the City for coordination of the proposed pavingand related improvtments with the requirements of such other agencies. It shall be the Engineer's duty hereunder to secure necessary information from such agencies. 3, The n` ineer shall advise the City with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The Engineer shall also advise the City concerning the results of same. Such surveys, tests, and investigations shall be made only upon authorization by and at the expense of the City, 4. The Engineer shall supply the plans to all known utility companies, including franchised utilities and pipeline companies which have known existing facilities within the limits of the Project, One set of dated preliminary plans, and one set of dated and approved advertising (final) plans shall also be submitted at the appropriate intervals. 5. The Engineer shall provide necessary design field surveys for his use in the preparation of nyphnnimirw qnti finnl tilmic mid cnpt-ifiritinnc: including, but not limited manholes. Flowlines of ex will be 50' left right of the from the connection point sidewalks to the house wil cleanouts. (a) Survey files fc design the des (b) ShadOWCTest s Establish coot; Unless otherw vertical datum (c) Contact utility (d) Establish ver pen sti (d) Attempt to tic All trees shall be tied within the desi e tied, along with the locations of any 3UIVUY U1,11,11h distance of 100' corridor. Lead sanitary sewer request them to locate utilities which cross or s. Perform field surveys to tic the horizontal and es when located. ,hmarks within the project limits on existing ild comers if found, as well as fence lines ie survey control network within the pror, route. EME 1. Upon completion of the survey, the Engineer shall then proceed with preparation of the preliminary design of the project. Em I 91 h. m C. FINAL PLANS, SPECIFICATIONS, AND ESTIMATE (P S & E) m a c, finalize Typical, Sections. d. Prepare Traffic Control Plan sheets (fall size, 1:40 scale) and construction phasing plans Engineer shall provide opinions of probable cost, and furnish two (2) copies of detailed a. Develop miscellaneous shects, such as Title Sheet, Horizontal Control Sheet, General e. Prepare Storin Sewer Plan and Profile sheets (full size, 1:20 scale) to account for possible additional storm sewer inletsd aterals. f Prepare final Paving Plan and Profile sheets (full size, 1:20 horizontal scale) for project. g. Provide final design cross sections every 50 feet along the project, to be included in the construction documents. h. Incorporate comments from the utility companies pertaining to the location of existing facilities and attend utility coordination meeting anion g impacted utilities at City Hall. �i. Prepare Striping/Signage Plans (full size, 1.40 scale) for proposed project improvements. j. Finalize Special Conditions, which will include Special Technical specifications. k. Meet with City to develop final phasing of construction and traffic control plan (to be 1. Complete quantity talc -off and prepare final estimate of probable construction cost based on final plans. n Prepare, final bid docurnents including bid proposal forms, construction plans, 2. a herein. D. CONSTRUCTION ADMINISTRATION. I , Bidders for gazine and 2, The Engineer will attend a pre-bid meeting if deemed necessary by the City. 3. The Engineer shall assist in the tabulation and review of all bids received for the construction of the improvements, mid shall make recommendations to the City concerning review, shall be for general conformance with the design concept and project(s). 5. Engineer will attend a pre-construction conference with City staff, Contractor( s), and all affected utility compariies. 0 S. Engineer will be available for interpretation of plans and specifications as may be required Thy the Contractor(s) in the fiefd. 9. The Engineer will, with assistance from the City Inspector on the project(s), prepare and of the project and F. EXCLUSIONS The intent of this scope of services is to include only the services specifically listed llffein and none others. Services specifically excluded from this scope of services include, but are not and City may mutually agree upon a scope/fee amendment to 1, Certification that work is in accordance with plans and qpeci fi cations, beyond standard I 5, 6. 7. • 8, 9. 10. IL 12. 11 W. is, 16. 17. 18. 19� 20, 21. 21 COMPENSATION: The following is a summary of the estimated charges for the various elements of the proposed services: Part 1: Basic Fee (lump sure } A. Engineering and Surveying for Design... ...... __ ........ ......... _ ...... - ......... $ 188,000 B. Surveying for Future Design ............ ...................... ............... . $ 42,000 A. Reimbursable Expenses (printing, as-built prep, cost-plus) ......... _ _ _$ 2,000 Subtotak. $ 2,000 Maximum Fee Not to Exceed: S 232,000