Loading...
WA9601B-CS 990505 "' PHONE NO.: 972 72:3 G870 ~ ~la,-j. 04 1999 '10:41PPI FOX CONTRACTORS, INC. ..:,. ..:.. :: FiX I,.IIIR (23.,t) 723-6007 ~.-, .:";lh.-,,har of pagas includ~ng coversheet ~ · all pages are not receivedt please call (214) 723-6870. P.O. BOx 951 , MIDLOTHIAN. TEXAS 76065 · (214) 723-6870 ~d bJd~1~:OI 666I I~0 '6eW 0Z_89 £~L ~Z_6: 'ON ~NOHd C:} II If}. _ |1 II II II II I| II I| I I ' -~, II iII ! -~., ......... It II ~. Ii ii .IJ II II ~ II f~ I| II ~ II ~ II II II II II II II II II II ii II II II II II II II II 0 ., i~,:,, £d N~£~:OI 666f ~0 'BeN 0L89 £8L ~L6: 'ON BNOHd A PHONE NO, : 972 723 6870 ~ Mag, 04 1999 10:44P1'1 P4 FOX CONTRACTORS, INC. MATE NO.: 1 DATE: 5-05-99 4-13-99 TO: 4-30-99 '- CITY OF COPPELL SANDY LAKE RD WATER LINE From: Wagon Wheel Ranch Elevated Tank To: Denton Tap Road, ProjeCt No. Wa 96-01A Shimek, Jacobs & Finklea 8333 Douglas, Ste. 820 Dallas, TX 75225 Fox Contractors. Inc. P.O. Box 951 Midlothian, TX 76065 76065 AMOUNT: ,243.50 OF JOB STATUS ~Z (~ ' Work Completed $ 236.666_.50 By: ;.~.. F6~.St Order 1 $ __17,500.00 Date: Amt. to Date $ 254,166.50 APPROVED: For Engineer .0% Retained $ 25,416.65 Date: $ 228,349.85 APPROVED: ~:;:',:,' :" .- Fc,r Owner Previous Payments $__ .0O Date: Due This Period $ 228.,749.85 RO. Box 951 - MIDLOTHIAN, TEXAS 76065 - (972) 723-8870 A PHONE NO. : 972 725 6870 '~ Ma~. 04 1999 10:44PM P5 !' CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap Road ~" CHANGE ORDER NO, 1 :-~. INTENT OF CHANGE ORI;),ER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 951, Midlothian, Texas 76065, for construction of the ,.. Sandy Lake Road Water Lin= - Wagon Wheel Ranch Elevated Tank to Denton Tap Road, dated December 8, 1998. Du¢ to conflict with the existing .16-inch wattline and the proposed 24-inch waterline underneath the northbound lanes of Denton Tap Road, approximately 40-linear feet of installed 36-inch encasemcrtt pipe is re-bored at a lower grade. See the attached r~vised construction drawing. E~ECT OF CHANGE ON CONTRACT AMOUNT This change orde7 will have the following effect on the cost of this project: Item ..... Amount ~ of Change No- ! Description I Previous Qua. nfitY ~ Quantity This C.O. ~ Revised .. Qu. antity ] Unit ~ Un.it. Price 'c :.. '.~ 41 Re-Bore 36" PmcasementPip¢ due to 0 I 1 L.S. $17,500.00 $17,500.00 ';~ Conflict wi~ Existing 16" Wat¢fline · Total: $17,500,00 :';-. Original Contract Amount $912,2zt3.50 Change Order No. I 17,500.00 .;, Revised Contract Amount $929,743.50 ; EFFECT OF CHANGE ON CONTRACT TIME Th= work required under this change order will not add any calendar days to this project. I; Origifial Contract Time 200 calendar days ~,' Change Order No. 1 ~ 0 calendar days · Revised Contract Time a0O~ calendar days PHONE NO.: 972 723 6870 '~ Ma~. ~4 1999 10:45PM P6 AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, ]nc,, do h~r~by agree ~o ~ppend this Change Order No, 1 to the original contra0t between themselves, dated D~;ember 8, 1998, City of Coppert, Texas Fox Contractors, Inc. (4/'2/99) Paga 2 ~f 2