ST0301A-LR100818 (3)RuUAncE
G cEorEcnrocAL
Cffi UP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444 -8889 Fax: (972) 444 -8893
Acct ID:
1770 File No: C10 -0631
Date Sampled: 08/13/2010
Report Date: 08/18/2010
Sampled By: Tim Gatton
Project:
Bethel Road Paving & Utility Improvements
By Order Of: Dale Young
Location:
Retain Wall Footing North Side of Bethel Road
Order Number: Vendor #9176
Contractor:
JRJ Paving
Client:
The City of Coppell
REPORT:
Reinforcing Steel Inspection
LAB NO: 89129 -1
TEST RESULTS Report No: 89129 -1
Page 1 of 1
On the basis of our visual inspection, the reinforcing steel placement meets the requirements of the project plans and
specifications. Retaining wall footing north side of Bethel Rd from Stations 36 +50 to 39 +00. 545 rebar on horizontal
running east to west at 12" O.C.
2344 rebars on horizontal running north to south at 15" O.C.
4645 rebars "L "' on vertical at 15" O.C.
348' rebar dowels with one side covered with rooting for paper at expansion joints.
• Size: #4, #5, #8 dowels
• Cover: 3'
• Splice Length: na
• Cleanliness: good
• Properly Tied: yes
• Cleanliness of Form Work: good
• Proper Support: yes
REFERENCE DRAWING: RW 1 (H) A, RW 2 for #8 dowels
Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E.
Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
(1 -ec copy)
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
1 -ec JRJ Paving Attn: Mr. Marty Murphy
1 -ec The City of Coppell Attn: Rhonda Adloo
1 -hc The City of Coppell Attn: Mr. Larry Davis
Respectfully Submitted,
Alliance Geotechnical Group
Y 4 . 9--
Robert P. Nance, Sr. Project Manager