Loading...
ST0301A-LR100818 (3)RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 08/13/2010 Report Date: 08/18/2010 Sampled By: Tim Gatton Project: Bethel Road Paving & Utility Improvements By Order Of: Dale Young Location: Retain Wall Footing North Side of Bethel Road Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Reinforcing Steel Inspection LAB NO: 89129 -1 TEST RESULTS Report No: 89129 -1 Page 1 of 1 On the basis of our visual inspection, the reinforcing steel placement meets the requirements of the project plans and specifications. Retaining wall footing north side of Bethel Rd from Stations 36 +50 to 39 +00. 545 rebar on horizontal running east to west at 12" O.C. 2344 rebars on horizontal running north to south at 15" O.C. 4645 rebars "L "' on vertical at 15" O.C. 348' rebar dowels with one side covered with rooting for paper at expansion joints. • Size: #4, #5, #8 dowels • Cover: 3' • Splice Length: na • Cleanliness: good • Properly Tied: yes • Cleanliness of Form Work: good • Proper Support: yes REFERENCE DRAWING: RW 1 (H) A, RW 2 for #8 dowels Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Rhonda Adloo 1 -hc The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager