Loading...
Shake & Shingle 2-LR100811CONCRETE CYLINDER TEST REPORT Ingle Office Buildings 3 & 4 Northlake Drive and E. Belt Line Road Coppell, Texas REPORTED TO:REPORT NO. Ratcliff Constructors 54 4200 Beltway Drive REG PROJECT NO. 16566 Addison, Texas 75001 SAMPLE DATE: 07-14-10 ATTN: Mr. Charley Conway TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 CONTRACTOR: Ratcliff Constructors Location of Sample Set Number Location Quantity Represented 1 Sidewalk: 10’N, 2’E from S.E. corner of Building 320/70 Design Information Source of Concrete Mix Identification Specified Strength (psi) TXI 8204 3000 Test Results SetCylinder Age @ Total Load Compressive Average No.IDDate Tested Test(lbs.)Strength (psi) Strength (psi) 1 1113 07-21-10 7 49960 3980 1113 08-11-10 28 57960 4610 1113 08-11-10 28 60410 4810 4710 1113 Hold H Cylinder Data AirConcrete AirUnit SetCylinder Slump Time of TemperatureTemperatureEntrainmentWeightTicket 3 No.ID(inches)Sample (°F)(°F)(%) (lbs/ft)Number 1 1113 4.0 5:20 AM 84 88 3.6 145.0 1022261 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-MailSubmitted by: Distribution: (1) Ratcliff Constructors/ REED ENGINEERING GROUP, LTD. Mr. Charley Conway Registration Number F-3114 (1) City of Coppel/Mr. Larry Davis (1) City of Coppell/Mr. Mike Arellano (1) Ratcliff Constructors/Mr. Derek Free (1) McHale Engineering/ Mr. Gary McHale Bill Woolwine (1) Pavecon Commercial Concrete/ Sr. Manager, CMT Mr. Chad Robertson BW/cn Mail Distribution: (1) Pross Design Group/Mr. Mark Pross 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX