Loading...
Sales Tax 09-CS1007022010) Keith Marvin - RE: Addendum #1 -draft Page 1 From: "Chris B. Seely" <cseely @tnp- on line. com> To: "Keith Marvin" <kmarvin @coppelltx.gov> CC: "Christa Christian" <CChristian @coppelltx.gov> Date: 7/2/2010 3:18 PM Subject: RE: Addendum #1 - draft Attachments: ADDENDUM 1.pdf; ADDENDUM 1.doc Keith: Attached is the revised addendum with the stricken text. I have attached it in PDF and in Word for posting to BidSync. I have also started faxing it to the contractors. Thanks! Chris Chris Seely, P.E. (TX) Teague Nall and Perkins, Inc. - - - -- Original Message---- - From: Keith Marvin [mailto:kmarvin @coppelltx.gov] Sent: Friday, July 02, 2010 1:54 PM To: Chris B. Seely Cc: Matt Atkins Subject: Re: Addendum #1 - draft Chris, This looks good. I would prefer to include all the text that is being stricken so there is no confusion. Sorry I had to leave so quickly after the meeting yesterday. appreciate your effort on this project. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "Chris B. Seely" <cseely @tnp- on line. com> 7/2/2010 11:10 AM >>> Keith: Attached is the draft addendum for review. Chris Chris Seely, P.E. (TX) Project Manager TEAGUE NALL AND PERKINS, INC. 12160 North Abrams Road Suite 508 2010) Keith Marvin - RE: Addendum #1 -draft Page 2 Dallas, Texas 75243 214.461.9867 phone 214.461.9864 fax cseely@tnp-online.com www.tnp - online.com CITY OF COPPELL 2009 STREET RECONSTRUCTION S. HEARTZ ROAD, DOBECKA DRIVE & CLEAR CREEK LANE (BID NO. Q- 0710 - 07) ADDENDUM #1 JULY 2, 2010 THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT PLANS AND SPECIFICATIONS. ADDENDUM IS ISSUED TO MODIFY, CLARIFY, EXPLAIN, OR CORRECT THE ORIGINAL PLANS AND SPECIFICATIONS. ANY CHANGES CALLED OUT IN THIS ADDENDUM SUPERSEDES THE ORIGINAL PLANS AND SPECIFICATIONS. 2. BIDDERS SHALL INCLUDE THIS SIGNED ADDENDUM WITH THE BID AND ACKNOWLEDGE THE RECEIPT OF THIS ADDENDUM BY STATING THAT ACKNOWLEDGEMENT ON THE OUTSIDE LOWER RIGHT HAND CORNER OF THE SEALED ENVELOPE CONTAINTING THE BID. 3. THIS ADDENDUM CONSISTS OF 2 PAGES. 4. THE FOLLOWING MODIFICATIONS SHALL BE MADE TO THE DOCUMENTS AS INDICATED- SPECIFICATIONS 1. Bid Summary — Sections A, B, C and Total Project: The bidder shall indicate the same bid amount in both the "Subtotal Bid items..." and the "Total Bid Items..." blanks. 2. Section 5, Pay Item #143 — Right -of -Way Preparation (page 5-4): This Pay Item is bid lump sum per roadway and not a total for all three roadways. Therefore, strike the last two sentences of the third paragraph section. The paragraph should read as follows. "Measurement and payment for work performed and materials furnished related to general site preparation, as provided herein, shall be made on the basis of the price bid per lump sum (LS) and shalt be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. being divide li ­ l e no morn than 0 ihps item Shah be Paid fop UPOF4 Got of the Site pFepaFafi@1�110F lRe flF51 , 3. Section 5, Pay Item #106 — 8" Lime Subgrade Treatment (page 5 -5): Strike the last sentence of the second paragraph. The paragraph should read as follows. "Lime treatment shall be provided under all proposed concrete pavement, median pavement, curbs, and alley pavement as indicated on the plans, unless noted otherwise or approved otherwise by the Engineer, and shall extend to a point at least one -foot behind the back of curb. After subgrade treatment and shaping is complete, CONTRACTOR shall maintain the proper moisture content in the subgrade to prevent drying and cracking, until covered by paving material. applied, Addendum #1 Page 1 7/2/2010 4. Section 5, Pay Item #130 — 6" and 8" PVC Water Line (page 5 -13): The City requires water line smaller than 10" in diameter to be Class 200 DR -14 instead of the DR -18 that is specified. Therefore, the first sentence shall be replaced with the following sentence: "This work includes the furnishing and installation of 6" and 8" PVC Class 200 DR -14 G- rsnn no rt water line at the locations shown in the plans as per NCTCOG Items 506 & 502.4 and the City of Coppell Standard Construction Details. 5. Section 5, Pay Itern #144 -145 -, Sanitary Sewer Services (Various Lengths) (page 5 -17): Replace the second paragraph with the following paragraph: "The City Engineering Department has determined that the existing sanitary sewer main in Dobecka Drive shall remain in place. The Contractor is responsible for TV of the existing sanitary sewer main to locate the service for each lot if necessary. This Pay Item includes the replacement of each sanitary sewer service line from the main to the property line. A new service connection saddle shall be installed at the connection to the main. A new sanitary sewer cleanout shall be located at or near the property line. All materials used for the connection, cleanout installation and line replacement are subsidiary to this Pay Item_" CLARIFICATIONS 1. Paving with the use of a screed is not allowed. Slip form paving using a self - propelled machine shall be required in accordance with Note #7 on City Standard Detail 2030. 2. The Variable Height Retaining Waii specified in the plans and Included as Pay Item #114 shall be in accordance with the City Standard Detail 2180 — Reinforced Concrete Retaining Wall Integral with Sidewalk. The Contractor shall provide the City Engineer with a list of available colors for concrete stain. The Engineer will select the color to be used. The sidewalk adjacent to the wall shall be standard concrete without stain_ 3. Compact fittings are NOT allowed. Full body fittings will be required on all roadways. All fittings shall also be domestic and not import. 4. The Bid Bond shall be prepared based on 5% of the bidders total bid and not per roadway. END OF ADDENDUM #1 Sir ' -;'� ................... sea ..:a■ clrwma 11 SEELY c. 92629 - 741jo' Signature of Acknowledgement - Addendum #1 Page 2 7/212010