Loading...
Sales Tax 09-CS100714 Page 1 of 1 Keith Marvin - Coppell Streets - TDLR From:   "Chris B. Seely" <cseely@tnp-online.com> To:   "Keith Marvin" <kmarvin@coppelltx.gov> Date:   7/14/2010 5:01 PM Subject:   Coppell Streets - TDLR CC:   "Mark Holliday" <mholliday@tnp-online.com>, "Matt Atkins" <matkins@tnp-online.com>   Keith:   I talked with Blair Baker with Texas Access (TDLR RAS) today regarding the review of our project.  The rules state that for public projects each roadway is considered a separate project (separate submittal, fees, inspection, etc.).  At the same time, you can also break the pedestrian elements cost down as well per roadway instead of a total project cost of over $50,000.  The pedestrian elements on each street are less than $50,000.  We will not have to submit the plans for TDLR review.   Regarding the construction cost to be used for TDLR fees, you were correct.  The fees are based on pedestrian elements cost only.  Below is the TDLR information.   68.102. Public Right-of-Ways Projects. (New section effective February 1, 2005, 30 TexReg 382; amended effective March 1, 2007, 32 TexReg 884) (a) For purposes of §68.80 (fees), the estimated cost of construction for the project shall be based on the pedestrian elements only. Construction documents submitted for review are only required to include pedestrian elements being constructed, renovated, modified, or altered as part of the project scope."   Thanks! Chris   Chris Seely, P.E. (TX) Project Manager TEAGUE NALL AND PERKINS, INC . 12160 North Abrams Road Suite 508 Dallas, Texas  75243 214.461.9867 phone 214.461.9864 fax cseely@tnp-online.com www.tnp-online.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C3DED7CCity...8/26/2010