Arbor Manors-CS091007
(8/4/2011) Keith Marvin - Fwd: Arbor Manors Sanitary Sewer RevisionPage 1
From: Keith Marvin
To:Dutt, Ted; Hollowell, Glenn
CC:Garza, Michael
Date: 10/7/2009 4:15 PM
Subject: Fwd: Arbor Manors Sanitary Sewer Revision
Attachments:X_Projects LDD_05088_dwg_05088-SANPROFILES (3) (1).pdf
This looks like it will work. They are not showing our 24" water line, but when we put that in we went under the existing 8"
line, so we will be over with this too.
Any thoughts?
Keith
>>> "Casey Ross" <cross@daa-civil.com> 10/7/2009 3:56 PM >>>
Keith,
Please find attached a revision for the sanitary sewer line connection
at the northwest corner of Arbor Manors. We adjusted the existing
north/south "Verizon" line from the existing manhole on the north side
of Sandy Lake Road to the northern most existing manhole on Verizon's
property. The replacement portion going under Sandy Lake needed to be
upsized to a 12" so we could meet TCEQ minimum slope requirements. The
steepest that line could be is 0.20%. We also adjust the proposed Line
"J" from Station 0+00 to 8+03.24. Please review and let me know if you
have any questions.
Thanks,
Casey Ross, P.E.
Dowdey, Anderson & Assoc.
5225 Village Creek Drive, Suite 200
Plano, TX 75093
972-931-0694 (O)
469-576-1039 (C)
972-931-9538 (F)
Page 1 of 1
Keith Marvin - Arbor Manors Sanitary Sewer Revision
From: "Casey Ross" <cross@daa-civil.com>
To:"Keith Marvin" <kmarvin@ci.coppell.tx.us>, "Michael Garza"
<mgarza@ci.coppell.tx.us>
Date: 10/7/2009 3:59 PM
Subject: Arbor Manors Sanitary Sewer Revision
CC:"Matt Alexander" <malexander@daa-civil.com>, <dalepowrie@sbcglobal.net>,
<tishmeal@rodmancompanies.com>, <bvilhauer@rodmancompanies.com>,
<jbarrett@dwhomes.com>, <ljackson@DWHOMES.com>
Attachments: X_Projects LDD_05088_dwg_05088-SANPROFILES (3) (1).pdf
Keith,
Please find attached a revision for the sanitary sewer line connection at the northwest corner of Arbor Manors.
We adjusted the existing north/south “Verizon” line from the existing manhole on the north side of Sandy Lake
Road to the northern most existing manhole on Verizon’s property. The replacement portion going under Sandy
Lake needed to be upsized to a 12” so we could meet TCEQ minimum slope requirements. The steepest that
line could be is 0.20%. We also adjust the proposed Line ”J” from Station 0+00 to 8+03.24. Please review and
let me know if you have any questions.
Thanks,
Casey Ross, P.E.
Dowdey, Anderson & Assoc.
5225 Village Creek Drive, Suite 200
Plano, TX 75093
972-931-0694 (O)
469-576-1039 (C)
972-931-9538 (F)
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4ACCBAE9City...8/30/2010
X:\ProjectsLDD\05088\dwg\05088-SANPROFILES.dwg,(3),10/7/20093:07:36PM,jallen,Dowdey,Anderson&Associates,Inc.,JA
X:\ProjectsLDD\05088\dwg\05088-SANPLAN.dwg,(1),10/7/20093:08:25PM,jallen,Dowdey,Anderson&Associates,Inc.,JA