Dear Mr. Griffin:
The enclosed information documents changes made to the 2008 -2011 Transportation
Improvement Program and /or Statewide Transportation Improvement Program for City of
Coppell projects. Modifications to the TIP /STIP are approved by the Regional
Transportation Council and /or the Texas Department of Transportation and the United
States Department of Transportation.
Copies of the enclosed documents have been forwarded to the appropriate federal and /or
state agencies in order to facilitate and expedite the implementation process. Please
contact Marcos Narvaez or me at 817/608 -2349 with any questions or concerns.
Sincerely,
(
Christie Jestis
Senior Program Manager
Transportation Project Programming
RP:Ip
Enclosure
cc: Wes McClure, P.E., Programming Engineer, TxDOT Dallas District
616 Six Flags Drive, Centerpoint Two
P. 0. Box 5888, Arlington, Texas 76005 -5888
(817) 640 -3300 FAX: 817 - 640 -7806 ® recycled paper
www.nctcog.org
5 To5 oz. 4
TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATION
Subregion: EASTERN
Program(s): L1 CMAO [_I STP -MM Transit :VI Other 10 (DFW RTR -DA1 AND DFW RTR -DE2 FUNDS)
Type of Modification: r___ Administrative Current RTC Action ❑ Previous RTC Action
Modification Number: 2008 -1022 STIP Revision Required ?: NO
NCTCOG Project Code(s): 11533
NCTCOG TIP Page Number(s): VII -80 MTP Reference(s): TH2 1810
TXDOT Control Section Job Number(s): 0918 -45 -868
Original Project Scope and COPPELL -- FREEPORT PKWY FROM SANDY LAKE RD TO RUBY RD; WIDEN 2 TO 4 LANES;
Location: ADDITION OF LANES
Original Funded Amount: FY09 -- $4,377,500 TOTAL ($2,000,000 DFW RTR -DA1, $1,502,000 DFW RTR -DE2, AND $875,500
LOCAL)
Approved Phase: 1 Engineering ROW [ _] Utilities k Construction/Implementation
Estimated Construction Cost: $4,140,000 Percent: 18%
Construction Bid Price: N/A Percent: N/A
Request: INCREASE FUNDING BY $772,500 TOTAL ($618,000 DFW RTR -DA1 AND $154,500 LOCAL) FORA REVISED
AUTHORIZED AMOUNT OF $5,150,000 TOTAL ($2,000,000 DFW RTR -DA1, $2,120,000 DFW RTR -DE2, AND $1,030,000
LOCAL) AND SPLIT FUNDING INTO MULTIPLE PHASES - $750,000 PE, $260,000 ROW, AND $4,140,000 CONST
Financial Constraint Statement:
DOES NOT VIOLATE FINANCIAL CONSTRAINT AS SUFFICIENT APPORTIONMENT AVAILABLE TO PROGRAM THE
REQUESTED FUNDING AMOUNT
Air Quality Conformity Statement:
THIS PROJECT IS INCLUDED IN MOBILITY 2030 PLAN -2009 AMENDMENT AND THE RESULTING AIR QUALITY CONFORMITY
ANALYSIS
Other:
Contingent on TxDOT approval? YES
• C / •by
P')/ 1
Michael Morris, P.E. Date
Director of Transportation
NCTCOG
The following signature authorizes:
k additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One.