Loading...
ST0502A-CS100723 • North Central Texas Council Of Governments July 23, 2010 Mr. Ken Griffin, P.E. Director of Engineering Engineering & Public Works City of Coppell P.O. Box 9478 Coppell, TX 75019 Dear Mr. Griffin: The enclosed information documents changes made to the 2008 -2011 Transportation Improvement Program and /or Statewide Transportation Improvement Program for City of Coppell projects. Modifications to the TIP /STIP are approved by the Regional Transportation Council and /or the Texas Department of Transportation and the United States Department of Transportation. Copies of the enclosed documents have been forwarded to the appropriate federal and /or state agencies in order to facilitate and expedite the implementation process. Please contact Marcos Narvaez or me at 817/608 -2349 with any questions or concerns. Sincerely, ( Christie Jestis Senior Program Manager Transportation Project Programming RP:Ip Enclosure cc: Wes McClure, P.E., Programming Engineer, TxDOT Dallas District 616 Six Flags Drive, Centerpoint Two P. 0. Box 5888, Arlington, Texas 76005 -5888 (817) 640 -3300 FAX: 817 - 640 -7806 ® recycled paper www.nctcog.org 5 To5 oz. 4 TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATION Subregion: EASTERN Program(s): L1 CMAO [_I STP -MM Transit :VI Other 10 (DFW RTR -DA1 AND DFW RTR -DE2 FUNDS) Type of Modification: r___ Administrative Current RTC Action ❑ Previous RTC Action Modification Number: 2008 -1022 STIP Revision Required ?: NO NCTCOG Project Code(s): 11533 NCTCOG TIP Page Number(s): VII -80 MTP Reference(s): TH2 1810 TXDOT Control Section Job Number(s): 0918 -45 -868 Original Project Scope and COPPELL -- FREEPORT PKWY FROM SANDY LAKE RD TO RUBY RD; WIDEN 2 TO 4 LANES; Location: ADDITION OF LANES Original Funded Amount: FY09 -- $4,377,500 TOTAL ($2,000,000 DFW RTR -DA1, $1,502,000 DFW RTR -DE2, AND $875,500 LOCAL) Approved Phase: 1 Engineering ROW [ _] Utilities k Construction/Implementation Estimated Construction Cost: $4,140,000 Percent: 18% Construction Bid Price: N/A Percent: N/A Request: INCREASE FUNDING BY $772,500 TOTAL ($618,000 DFW RTR -DA1 AND $154,500 LOCAL) FORA REVISED AUTHORIZED AMOUNT OF $5,150,000 TOTAL ($2,000,000 DFW RTR -DA1, $2,120,000 DFW RTR -DE2, AND $1,030,000 LOCAL) AND SPLIT FUNDING INTO MULTIPLE PHASES - $750,000 PE, $260,000 ROW, AND $4,140,000 CONST Financial Constraint Statement: DOES NOT VIOLATE FINANCIAL CONSTRAINT AS SUFFICIENT APPORTIONMENT AVAILABLE TO PROGRAM THE REQUESTED FUNDING AMOUNT Air Quality Conformity Statement: THIS PROJECT IS INCLUDED IN MOBILITY 2030 PLAN -2009 AMENDMENT AND THE RESULTING AIR QUALITY CONFORMITY ANALYSIS Other: Contingent on TxDOT approval? YES • C / •by P')/ 1 Michael Morris, P.E. Date Director of Transportation NCTCOG The following signature authorizes: k additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One. k modification to a project funded through a TxDOT - selected program. Certified : t[IVW-) William Hale, P.E. / Date f g r aDistrict Engineer TXDOT, Dallas District