Loading...
ST0502B-CS100723 • North Central Texas Council Of Governments July 23, 2010 Mr. Ken Griffin, P.E. Director of Engineering Engineering & Public Works City of Coppell P.O. Box 9478 Coppell, TX 75019 Dear Mr. Griffin: The enclosed information documents changes made to the 2008 -2011 Transportation Improvement Program and /or Statewide Transportation Improvement Program for City of Coppell projects. Modifications to the TIP /STIP are approved by the Regional Transportation Council and /or the Texas Department of Transportation and the United States Department of Transportation. Copies of the enclosed documents have been forwarded to the appropriate federal and /or state agencies in order to facilitate and expedite the implementation process. Please contact Marcos Narvaez or me at 817/608 -2349 with any questions or concerns. Sincerely, ( Christie Jestis Senior Program Manager Transportation Project Programming RP:Ip Enclosure cc: Wes McClure, P.E., Programming Engineer, TxDOT Dallas District 616 Six Flags Drive, Centerpoint Two P. 0. Box 5888, Arlington, Texas 76005 -5888 (817) 640 -3300 FAX: 817 - 640 -7806 ® recycled paper www.nctcog.org STOS g TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATION Subregion: EASTERN Program(s): I l CMAQ Jii STP -MM FT Transit J Other 10 (DFW RTR -DE2 FUNDS) Type of Modification: Administrative yj Current RTC Action 7 i Previous RTC Action Modification Number: 2008 -1021 STIP Revision Required ?: NO NCTCOG Project Code(s): 11532 NCTCOG TIP Page Number(s): VII -80 MTP Reference(s): TH2 1815 TXDOT Control Section Job Number(s): 0918 -45 -867 Original Project Scope and COPPELL -- FREEPORT PKWY FROM SH 121 TO SANDY LAKE; CONSTRUCT NEW 6 -LANE Location: FACILITY; NEW ROADWAY Original Funded Amount: FYO9 -- $7,114,858 TOTAL ($5,691,886 DFW DFW RTR -DE2 AND $1,422,972 LOCAL) - CONSTRUCTION Approved Phase: [1 Engineering ROW ❑ Utilities n Construction/Implementation Estimated Construction Cost: $8,370,000 Percent: 17.6% Construction Bid Price: N/A Percent: N/A Request: INCREASE FUNDING BY $1,255,142 ($1,004,114 DFW RTR -DA1 AND $251,028 LOCAL) AND FOR A REVISED AUTHORIZED FUNDING AMOUNT OF $8,370,000 TOTAL ($5,691,886 DFW DFW RTR -DE2, $1,004,114 DFW RTR -DA1, AND $1,674,000 LOCAL) AND SPLIT INTO MULIPLE PHASES, $950,000 PE, $2,150,000 ROW, AND $5,270,000 CONST Financial Constraint Statement: DOES NOT VIOLATE FINANCIAL CONSTRAINT AS SUFFICIENT APPORTIONMENT AVAILABLE TO PROGRAM THE REQUESTED FUNDING AMOUNT Air Quality Conformity Statement: THIS PROJECT IS INCLUDED IN MOBILITY 2030 PLAN -2009 AMENDMENT AND THE RESULTING AIR QUALITY CONFORMITY ANALYSIS Other: jNj Contingent on TxDOT approval? YES Ce by / o g Michael Morris, P.E. Date Director of Transportation NCTCOG The following signature authorizes: additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One. WI modification to a project funded through a TxDOT - selected program. Certified b 7497d William Hale, P.E. Date forz_District Engineer TXDOT, Dallas District