ST0502B-CS100723 •
North Central Texas Council Of Governments
July 23, 2010
Mr. Ken Griffin, P.E.
Director of Engineering
Engineering & Public Works
City of Coppell
P.O. Box 9478
Coppell, TX 75019
Dear Mr. Griffin:
The enclosed information documents changes made to the 2008 -2011 Transportation
Improvement Program and /or Statewide Transportation Improvement Program for City of
Coppell projects. Modifications to the TIP /STIP are approved by the Regional
Transportation Council and /or the Texas Department of Transportation and the United
States Department of Transportation.
Copies of the enclosed documents have been forwarded to the appropriate federal and /or
state agencies in order to facilitate and expedite the implementation process. Please
contact Marcos Narvaez or me at 817/608 -2349 with any questions or concerns.
Sincerely,
(
Christie Jestis
Senior Program Manager
Transportation Project Programming
RP:Ip
Enclosure
cc: Wes McClure, P.E., Programming Engineer, TxDOT Dallas District
616 Six Flags Drive, Centerpoint Two
P. 0. Box 5888, Arlington, Texas 76005 -5888
(817) 640 -3300 FAX: 817 - 640 -7806 ® recycled paper
www.nctcog.org
STOS g
TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATION
Subregion: EASTERN
Program(s): I l CMAQ Jii STP -MM FT Transit J Other 10 (DFW RTR -DE2 FUNDS)
Type of Modification: Administrative yj Current RTC Action 7 i Previous RTC Action
Modification Number: 2008 -1021 STIP Revision Required ?: NO
NCTCOG Project Code(s): 11532
NCTCOG TIP Page Number(s): VII -80 MTP Reference(s): TH2 1815
TXDOT Control Section Job Number(s): 0918 -45 -867
Original Project Scope and COPPELL -- FREEPORT PKWY FROM SH 121 TO SANDY LAKE; CONSTRUCT NEW 6 -LANE
Location: FACILITY; NEW ROADWAY
Original Funded Amount: FYO9 -- $7,114,858 TOTAL ($5,691,886 DFW DFW RTR -DE2 AND $1,422,972 LOCAL) -
CONSTRUCTION
Approved Phase: [1 Engineering ROW ❑ Utilities n Construction/Implementation
Estimated Construction Cost: $8,370,000 Percent: 17.6%
Construction Bid Price: N/A Percent: N/A
Request: INCREASE FUNDING BY $1,255,142 ($1,004,114 DFW RTR -DA1 AND $251,028 LOCAL) AND FOR A REVISED
AUTHORIZED FUNDING AMOUNT OF $8,370,000 TOTAL ($5,691,886 DFW DFW RTR -DE2, $1,004,114 DFW RTR -DA1,
AND $1,674,000 LOCAL) AND SPLIT INTO MULIPLE PHASES, $950,000 PE, $2,150,000 ROW, AND $5,270,000 CONST
Financial Constraint Statement:
DOES NOT VIOLATE FINANCIAL CONSTRAINT AS SUFFICIENT APPORTIONMENT AVAILABLE TO PROGRAM THE
REQUESTED FUNDING AMOUNT
Air Quality Conformity Statement:
THIS PROJECT IS INCLUDED IN MOBILITY 2030 PLAN -2009 AMENDMENT AND THE RESULTING AIR QUALITY CONFORMITY
ANALYSIS
Other:
jNj Contingent on TxDOT approval? YES
Ce by /
o g
Michael Morris, P.E. Date
Director of Transportation
NCTCOG
The following signature authorizes:
additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One.
WI modification to a project funded through a TxDOT - selected program.
Certified
b 7497d
William Hale, P.E. Date
forz_District Engineer
TXDOT, Dallas District