Loading...
ST0301A-LR100823 Consulting Engineering * Geotechnical Engineering * Construction Materials f9LLIAhCE 3228 Halifax Street, Suite A, Dallas, Texas 75247 GEOTECHNICAL Phone: (972) 444 -8889 Fax: (972) 444 -8893 GROUP Acct ID: 1770 File No: C10 -0631 Date Sampled: 08/16/2010 Report Date: 08/23/2010 Sampled By: McDonald, Jack Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Bethel Road Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Lime - Treated Material Gradation LAB NO: 89246 Test Method: See Below TEST RESULTS Report No: 89246 Page 1 of 1 A representative of Alliance Geotechnical Group, checked the gradation of the lime- treated subgrade. Gradation tests were performed on the mixed material prior to compaction to verify compliance with project specifications which require a minimum of 100% passing the 1 3/4 in. sieve and 60% passing the #4 in. sieve. The test results follow. The results of these tests indicate compliance of the treated subgrade with grading requirements of the specifications. Test No. Location Sieve, in. I % Passing 1 Bethel Rd. Eastbound right lane - Station 52 +75 1 3/4" 100 #4 87.0% 2 Bethel Rd. Eastbound right lane - Station 51 +25 1 3/4" 100% #4 84.0% 3 Bethel Rd. Eastbound right lane - Station 49 +75 1 3/4" 100% #4 75.0% 4 Bethel Rd. Westbound right lane - Station 52 +50 1 3/4" 100% #4 66.0% 5 Bethel Rd. Westbound right lane - Station 51 +00 1 3/4" 100% #4 63.0% 6 Bethel Rd. Westbound right lane - Station 50 +00 1 3/4" 100% #4 71.0% 7 Bethel Rd. Westbound right lane - Station 48 +50 1 3/4" 100% #4 67.0% z /' s / 7j)) d 0 Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Respectfully Submitted, Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) / Alliance Geotechnical Group 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E,� 1 -ec JRJ Paving Attn: Mr. Marty Murphy ��// t a " 1 -ec The City of Coppell Attn: Rhonda Adloo 1 -hc The City of Coppell Attn: Mr. Larry Davis t #°°- Robert P. Nance, Sr. Project Manager