ST0301A-CN100824 JRJ PAVING, L.P. Proposed Change Order 11R DATE: 8/24/2010 TO: City of Coppell PROPOSAL FOR : Bethel Rd II ATTN: Keith Marvin / I Description j - Unit Quantity, Unit Price Total Amount 2 .-C'2 / � ) A C 6 tems 1 Remove Concrete Footing Installed (62' of Wall at Average) SF , $20.40 $8;853'.80' l 2 Excavate & Remove Concrete Footing (62' of W I at 7' average) Day 1 $1,860.00 $1,860.00 u D 3 Haul Concrete to Big City LD ,4' 1 •) $180.00 SM.''S 2-7 Q 4 Cost for Reinforcing Wall Steel (On Site and not Used) LBS 2142 $0.78 $1,670.76 Total if wall not rebuilt, Items 14 $13,104.36 Total if wall is rebuilt in new location, Items 1 -3, with item 206 on contract used to build back wall. $11,433.60 1 (-/6 q'd 0 Item 1 listed pricing is 50% of unit price of contract item 206. / Item 4 will be deleted if the the wall is reinstalled Should you have any questions or require additional information please feel free to call me. Respectfully Submitted, Dean Dumke Sr Project Manager 1805 ROYAL LANE, STE. 107 DALLAS, TX. 75229 Page 1 of 1 PH. 214 - 466 -8340 FAX 214 - 466 -8354 JRJ PAVING, L.P. Proposed Change Order IIR DATE: 8/24/2010 TO: City of CoppelI PROPOSAL FOR : Bethel Rd II ATTN: Keith Marvin Item Description Unit Quantity Unit Price 1 Remove Concrete Footing Installed (62' of Wall at 7' Average) SF 434 $20.40 2 Excavate & Remove Concrete Footing (62' of Wall at T average) Day 1 $1,860.00 3 Haul Concrete to Big City LD 4 $180.00 4 Cost for Reinforcing Wall Steel (On Site and not Used) LBS 2142 $0.78 Total if wall not rebuilt, Items 1 -4 Total if wall is rebuilt in new location, Items 1 -3, with item 206 on contract used to build back wall Item 1 listed pricing is 50% of unit price of contract item 206. Item 4 will be deleted if the the wall is reinstalled Should you have any questions or require additional information please feel free to call me. Respectfully Submitted, Total Amount $8,853.60 $1,860.00 $720.00 $1,670.76 $13,104.36 $11,433.60 Dean Dumke Sr Project Manager