Loading...
DUD0901-CS090514010) Keith Marvin - RE Joseph's Village - EmergencySlideStabilization Page 1 From: "Holifield, Cindy" <cholifield @craigoldeninc.com> To: "Keith Marvin" <kmarvin @ci.coppell.tx.us> CC: "Richard Odell" <RODELL @ci.coppell.tx.us >, "Batchelder, Kay" <kbatchelde Date: 5/14/2009 6:20 PM Subject: RE Joseph's Village - EmergencySlideStabilization Attachments: 40101 Rev Proposal 09.05.14 ch. pdf Attached is our revised proposal with Bond Costs included. Please revise contract documents. Thank you, - - - -- Original Message---- - From: Keith Marvin [mailto: kmarvin @ci.coppell.tx. us] Sent: Thursday, May 14, 2009 5:28 PM To: Holifield, Cindy Cc: Richard Odell Subject: RE: L090230 - St. Joseph's Village - EmergencySlideStabilization - COINC Proposal Yes, we will go with all 3 bonds. Your forms will be ok so long as they are substantially similar to ours. Tuesday the 19th will be fine. Rick O'Dell will be the inspector for this project. He has worked with your firm recently. I think we can handle the pre -con in the field. Please have your folks contact Rick before getting started at 469- 576 -7709. 1 need the revised proposal with the new dollar amount, and the contract modified to reflect that change. We need signatures on the contract before our City Manager will sign it. If we can get that tomorrow will get him to sign it. Insurance and bonds can be brought in on Tuesday before you get started. Submittals are not required. We will inspect the materials when they come in. I would like sealed record drawings after the job is complete. Thanks Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "Holifield, Cindy" <cholifield @craigoldeninc.com> 5/14/2009 5:09 PM Which bonds - all three - Perf, Payment and Maintenance? And do bonds have to be on the contract form or can we provide our standard bond? Also, we had brief scheduling meeting, and we plan to mobilize on Tuesday, May 19th. Is that ok? - What has to happen for project to start. 1. Signed contract 010) Keith Marvin - RE Joseph's Village - EmergencySlideStabilization Page 2 2. Insurance Cert 3. Bonds 4. Precon meeting (can it be informal? - Inspector meet Super /Foreman onsite ?) 5. SubmittalS? Please let me know. Thanks - - - -- Original Message---- - From: Keith Marvin [mailto: KMARVI N @ci.coppell.tx. us] Sent: Thursday, May 14, 2009 4:33 PM To: Holifield, Cindy Cc: Batchelder, Kay Subject: Re: L090230 - St. Joseph's Village - EmergencySlideStabilization - COI NC Proposal Send them to Jerod Anderson in our purchasing department. You can send a copy to me with the contract. Keith - - - -- Original Message---- - From: "Holifield, Cindy" <cholifield @craigoldeninc.com> To: Keith Marvin <KMARVIN @ci.coppell.tx.us> Cc: Kay Batchelder <kbatchelder @craigoldeninc.com> Sent: 5/14/2009 2:04:46 PM Subject: RE: L090230 - St. Joseph's Village - Emergency SlideStabilization - COI NC Proposal Keith, We are ordering our Insurance Certificate - where do we send originals? Or do you want us to keep certs w /contracts? Thanks From: Holifield, Cindy Sent: Thursday, May 14, 2009 12:58 PM To: 'kmarvin @ci.coppell.tx.usI Subject: FW: L090230 - St. Joseph's Village - Emergency SlideStabilization - COI NC Proposal Estimated cost for bonds: Craig Olden, Inc. May 14, 2009 The City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Phone: 972.304.3681 Fax: 972.304.3570 Cell: 469.579.0664 Email: kmarvin(c ci.coppell.tx.us Attn: Mr. Keith Marvin, P.E. Ln RE: Revised - St. Joseph's Village — Emergency Slide Stabilization L Coppell, Texas Project No. 400101 (Target No. L090230) L. Mr. Marvin: 4. We appreciate the opportunity to work with you and to provide a proposal, complete and in- place, subject to to the Notes listed below, the attached General Conditions, the attached preliminary drawings prepared by ® Craig Olden, Inc., dated May 4, 2009, and in accordance with the direction of Mr. Keith Marvin, P.E. of The ® City of Coppell, for the following work at the above referenced site: 1.0 Engineering $ 8,000.00 2.0 Mobilization $ 10,000.00 3.0 Reinforced Gabion Slope Stability Structure $ 150,000.00 ® Subtotal $ 168,000.00 4.0 Performance, Payment, Maintenance Bonds $ 3,950.00 TOTAL AMOUNT $ 171,950.00 Notes: 1. Engineered plans prepared by Craig Olden, Inc., a Texas Registered Professional Engineering LU firm, shall be furnished by COINC prior to commencing the work. 2. This proposal based upon the field conditions as of the site visit by Joel Clark, P.E. and Ryan Watson, E.I.T. of Craig Olden, Inc. on April 16, 2009. Any changes in field conditions prior to beginning the work which require alteration to the scope of work and cost shall be cause for equitable adjustment of the contract amount. This provision shall not apply to changes in field conditions and resultant changes in the scope of work caused by COINC's negligence, willful misconduct, or intentional acts. 3. Suitable access and an acceptable staging location for the work shall be provided by others. 4. COINC shall excavate as required to facilitate the work. 5. Replacement or repair of damages to irrigation system due to slide movement shall be by others. 6. Replacement of vegetation, if required, shall by others. 7. This proposal is based on one (1) mobilization. Additional mobilizations are $10,000.00 each. P.O. Box 5000, Little Elm,TX 75068 m 972.294.5000 • 1.800.422.4667 • Fax 972.294.2664 . www.oldeninc.com 8. This proposal contingent upon acceptable contract documents. This proposal including the General Notes shall be attached as a part of the contract documents. In the event of conflict between the contract documents and the proposal, the terms and conditions of the proposal shall have precedence. 9. This proposal is good for thirty (30) days. If you have any questions or need additional information, please contact our office. Craig Olden, Inc. Cindy Hodeld Construction Operations CH:ch 010) Keith Marvin - RE Joseph's Village - EmergencySlideStabilization Page 3 The cost for P &P &M Bond for $168,000.00 will be $3940.00 The cost for Mbond only - 2 year for $168000 is $4,450.00 The cost for M bond - 2 year for $84000 is $2,450.00 This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. 010) Keith Marvin - RE: L090230 - St. Joseph's Village - EmergencySlideStabilization - COINC Proposal Page 1 From: "Holifield, Cindy" <cholifield @craigoldeninc.com> To: "Keith Marvin" <KMARVIN @ci.coppell.tx.us> Date: 5/14/2009 5:15 PM Subject: RE: L090230 - St. Joseph's Village - EmergencySlideStabilization - COINC Proposal Which bonds - all three - Perf, Payment and Maintenance? And do bonds have to be on the contract form or can we provide our standard bond? Also, we had brief scheduling meeting, and we plan to mobilize on Tuesday, May 19th. Is that ok? - What has to happen for project to start. 1. Signed contract 2. Insurance Cert 3. Bonds 4. Precon meeting (can it be informal? - Inspector meet Super /Foreman onsite ?) 5. SubmittalS? Please let me know. Thanks - - - -- Original Message---- - From: Keith Marvin [mailto :KMARVIN @ci.coppell.tx. us] Sent: Thursday, May 14, 2009 4:33 PM To: Holifield, Cindy Cc: Batchelder, Kay Subject: Re: L090230 - St. Joseph's Village - EmergencySlideStabilization - COINC Proposal Send them to Jerod Anderson in our purchasing department. You can send a copy to me with the contract. Keith - - - -- Original Message---- - From: "Holifield, Cindy" <cholifield @craigoldeninc.com> To: Keith Marvin <KMARVIN @ci.coppell.tx.us> Cc: Kay Batchelder <kbatchelder @craigoldeninc.com> Sent: 5/14/2009 2:04:46 PM Subject: RE: L090230 - St. Joseph's Village - Emergency SlideStabilization - COINC Proposal Keith, We are ordering our Insurance Certificate - where do we send originals? Or do you want us to keep certs w /contracts? Thanks 010) Keith Marvin - RE: L090230 - St. Joseph's Village - EmergencySlideStabilization - COI NC Proposal Page 2 From: Holifield, Cindy Sent: Thursday, May 14, 2009 12:58 PM To: 'kmarvin @ci.coppell.tx.usI Subject: FW: L090230 - St. Joseph's Village - Emergency SlideStabilization - COINC Proposal Estimated cost for bonds: The cost for P &P &M Bond for $168,000.00 will be $3940.00 The cost for Mbond only - 2 year for $168000 is $4,450.00 The cost for M bond - 2 year for $84000 is $2,450.00 This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. Page 1 of 1 Keith Marvin - FW: L090230 - St. Joseph's Village - Emergency S1ideStabilization - COINC Proposal From: "Holifield, Cindy" <cholifield(�craigoldeninc.com> To: <kmarvin(aci.coppell.tx.us> Date: 5/14/2009 4:15 PM Subject: FW: L090230 - St. Joseph's Village - Emergency Slide Stabilization - COINC Proposal Attachments: Emergency Slide Stabilization Contract.pdf Estimated cost for bonds: The cost for P &P &M Bond for $168,000.00 will be $3940.00 The cost for Mbond only — 2 year for $168000 is $4,450.00 The cost for M bond — 2 year for $84000 is $2,450.00 This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4AOC43BFCity_o... 9/1/2010