Loading...
Minyards Freeport Xing-CS090305 Page 1 of 1 Keith Marvin - Minyards  Freeport Crossing From:   "Jaime Beard" <JBeard@jonescarter.com> To:   <kmarvin@ci.coppell.tx.us> Date:   3/5/2009 5:13 PM Subject:   Minyards  Freeport Crossing   Keith,   Thanks for taking to the time to meet with us this afternoon.  As discussed in our meeting,  we will move forward with the following items regarding the private detention facility located on the Minyards Freeport Crossing Site:   We will remove the existing pump and replace it with a pump sized to drain the pond below the elevation of 513 within a 24-48 hr period.  The new pump will approximately pump at a rate of 500-1000 GPM.  Record drawings will note the pump model that it ultimately installed. Per our meeting it is my understanding the the City of Coppell does not object to the  modifications described above.    If you have any questions regarding the pond, onsite improvements,  or if there is anything in this e-mail that doesn't match your recollection of the meeting please do not hesitate to contact me.      Thanks again       Jaime R. Beard, P.E. jbeard@jonescarter.com JONES & CARTER, INC. ENGINEERS · PLANNERS · SURVEYORS 3030 LBJ Freeway, Suite 910 Dallas, Texas 75234-7747 Tel 972-488-3880 Ext. 304    Fax 972-488-3882 Cell 214-680-2823 Smart Engineering. Smart Solutions. TM www.jonescarter.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\49B00852City_of...9/1/2010