Shake & Shingle 2-CS100902 T H E C 1 T Y O F
COPPELL
A S .' 1 9
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin, P.E., Dir. of Engineering / Public Works
Glenn Hollowell, Asst. Dir. of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Deputy Chief/Prevention
From: Larry Davis, Construction Inspector
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
Date: September 2, 2010
RE: WALK -THRU INSPECTION for Shake & Shingle Addition, Phase 2
200 E. Belt Line Rd.
A final walk -thru for drainage and utilities on the referenced project has been scheduled
for:
Wednesday, September 8 th at 8:30 a.m.
Please let me know if I can be of further assistance.
cc: Charlie Conway, Ratcliff Constructors fax: 972 - 432 -9943
Pete Hennessey, Hennessey Engineering fax: 972 - 245 -7087
Streets Division
Utilities Division
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"