Loading...
Vistas of Coppell-CS091121 (9/7/2010) Keith Marvin - Re: Waterview traffic calmingPage 1 From: "Charlene Pinkerton" <cpinkerton@verizon.net> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date: 11/21/2009 2:25 PM Subject: Re: Waterview traffic calming Keith, I am faxing you two of the three completed surveys today. One of my other neighbors has the third one and I will fax that one when I receive it in the next day or two. Can you confirm receipt of the two that I am sending you today? They are for 445 Waterview Drive and 438 Waterview Drive. Thanks! Charlene ----- Original Message ----- From: "Keith Marvin" <kmarvin@ci.coppell.tx.us> To: <Cpinkerton@verizon.net> Sent: Monday, November 16, 2009 4:46 PM Subject: Waterview traffic calming Mr. & Mrs. Pinkerton, Attached please find a copy of the traffic calming survey that was sent to 35 residents of Waterview Drive last April. To date we have received 23 responses in favor of installing road humps. This is 3 shy of the required number. Due to the untimely departure of our traffic engineer I will extend the survey period through the end of the year. If we receive 3 more positive responses from verifiable residents we will move forward with the next step of the process. Feel free to call me with any questions. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681