Loading...
Wynnpage N 2&3-CS080813 (9/7/2010) Keith Marvin - RE: Wynnpage Lots 2 & 3 Storm WaterPage 1 From: "Greg Yancey" <gregyancey@verizon.net> To: "'Keith Marvin'" <kmarvin@ci.coppell.tx.us> Date: 8/13/2008 8:08 AM Subject: RE: Wynnpage Lots 2 & 3 Storm Water I'm probably just overly cautious. It looked like the inlet I saw out there last week was too far east to catch our water. I guess it will work once it's graded. Thanks for following up. Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Tuesday, August 12, 2008 3:16 PM To: Greg Yancey Subject: Re: Wynnpage Lots 2 & 3 Storm Water Greg, The plans for that subdivision reflect the drainage area for Wynnpage. They are placing an inlet in a common area to accept the drainage. If you want to look at what they've got in the plans feel free to drop by the office. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Greg Yancey" <gregyancey@verizon.net> 8/12/2008 9:05 AM >>> Hi Keith: Do you know if the development north of us (Ardinger property) picked up the storm water from Wynnpage? We had an agreement with Mr. Ardinger that the developer could re-work our site if necessary. It looks like they've finished most of the drainage improvements and have not contacted us about working at all on our project. (9/7/2010) Keith Marvin - RE: Wynnpage Lots 2 & 3 Storm WaterPage 2 Thanks, Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net __________ NOD32 3350 (20080812) Information __________ This message was checked by NOD32 antivirus system. http://www.eset.com