Loading...
DUD0901-CS100608 (9/7/2010) Keith Marvin - E. Sandy LakePage 1 From: Keith Marvin To:Griffin, Ken CC:Birdsall, Per; Hollowell, Glenn; Odell, Richard Date: 6/8/2010 9:06 AM Subject: E. Sandy Lake Craig Olden has begun repair work on the gabion wall on E. sandy lake. They would like to ask us to participate in the material cost of additional anchors that they will be installing. They are of the opinion that they should have been installed originally, and that they screwed up by not including them in the original design. They estimate it will be in the neighborhood of $5,000. I told them to write it up and submit it, and that we would look at it. Keith