Shake & Shingle 2-CS100908 T H E C 1 T Y O F
COPPELL
44,2 A S , 6
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin, P.E., Dir. of Engineering / Public Works
Glenn Hollowell, Asst. Dir. of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Deputy Chief /Prevention
From: Larry Davis, Construction Inspector 0
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
Date: September 8, 2010
RE: Continuation of WALK -THRU INSPECTION for Shake & Shingle Addition,
Phase 2, 200 E. Belt Line Rd.
The final walk -thru for drainage and utilities that was held up due to the weather on
Wednesday has been scheduled for:
Friday, September 10 at 8:30 a.m.
Please let me know if I can be of further assistance.
cc: Charlie Conway, Ratcliff Constructors fax: 972- 432 -9943
Pete Hennessey, Hennessey Engineering fax: 972 - 245 -7087
Streets Division
Utilities Division
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"