Loading...
Shake & Shingle 2-CS100908 T H E C 1 T Y O F COPPELL 44,2 A S , 6 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, P.E., Dir. of Engineering / Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Deputy Chief /Prevention From: Larry Davis, Construction Inspector 0 Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 Date: September 8, 2010 RE: Continuation of WALK -THRU INSPECTION for Shake & Shingle Addition, Phase 2, 200 E. Belt Line Rd. The final walk -thru for drainage and utilities that was held up due to the weather on Wednesday has been scheduled for: Friday, September 10 at 8:30 a.m. Please let me know if I can be of further assistance. cc: Charlie Conway, Ratcliff Constructors fax: 972- 432 -9943 Pete Hennessey, Hennessey Engineering fax: 972 - 245 -7087 Streets Division Utilities Division "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"