Loading...
WA9903-CS000509 CITY OF COPPELL, TEXAS ADDYfION OF PUMP NO; 4 ATTFIw. VIIJ.~t,(~E PARKWAY PUMP STATION Project No. WA99-03; Bid No. Q-119902 CHANGE ORDER NO.. 2 (Revised) A. INTENT OF CHANGE ORDER Ds The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Architectural Utilities, Inc., P.O. Box 11586, Fort Worth, Texas 76110, for the Addition of Pump No. 4 at the Village Parkway Pump Station, dated December 14, 1999. DESCRIPTION OF CHANGE This change covers the installation of ~" tap in 36" pipe, for pressure transmitter, and the modification of the suction piping required for Pump No. 4. EFFECT OF CHANGE ON CONTRACT AMOUNT. This change order will have the following effect on the cost of this project: Item Previous Quantity Revised Unit Amount No. Description Quantity This C.O. Quantity Unit Price of Change 5 Install W' tap h 36" pipe for 0 1 I LS. $227.00 S227.00 pressure transmitter Field Adjustments to Suction Piping (Pump 14o. 4) 6 0 1 1 LS. '765.00 765.00 Total: $992.00 Original Contract Amount Amount, Change Order No. 1 Amount, Change Order No. 2 Revised Contract Amount $346,000.00 10,684.00 992.00 $357,676.00 EFFECT OF CHANGE ON CONTRACT TIME The contract time shall not be affected by this change order. AGREEMENT By the signatures below of duly authorized agents, the City of Coppell and Architectural Utilities, Inc., do hereby agree to append this Change Order No. 2 to the original contract between themselves dated December 14, 1999. cop e_ lexaf" I" ' l' 'l' By: Date: Atte~ Architectural UOlifie~ Inc. Page I of 1