Loading...
Hunterwood Park-CS100315Page 1 of 1 Keith Marvin - Hunterwood Park gabion inspection #2 From: "Clark, Joel" <jclark(�'.&raigoldeninc.com> To: <jeliasgci.coppell.tx.us >, "Keith Marvin" <KMARVINgci.coppell.tx.us >, "James Graeber" <pgraeber(asbcglobal.net> Date: 3/15/2010 10:17 AM Subject: Hunterwood Park gabion inspection #2 Attachments: Inspection 2 report (03-15-10).pdf Gentlemen — please find attached inspection report. There are several items that need to be addressed. Please call if you have any questions. Thanks -Joel Joel R. Clark, P.E Craig Olden, Inc. Main (972) 294 -5000 Fax (972) 294 -2664 Direct (469) 287 -6105 Mobile (214) 537 -8635 iclark -craigoldeninc.com This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. file: HC: \Documents and Settings \radloo \Local Setting s\ Temp \XPgrpwise \4B9E0926City_... 9/13/2010 OLDEN Craig Olden, Inc. March 15, 2010 Mr. John Elias City of Coppell Parks and Recreation Dept 255 Parkway Boulevard Coppell, Texas 75019 ielias @ci.coppell.tx.us Re: Hunterwood Park Improvements / Project D08710 N Report of 03 -11 -10 Site Inspection L We performed an inspection of the initial stages of rock riprap and gabion installation at 3:00 p.m. on March 11, 2010. Our observations were as follows: N Q) L 1. There were numerous tying deficiencies observed on the Area #1 structure. The deficiencies included not using the double loop method and exceeding the 5 inch spacing per the O specifications. Contractor should refer to Section 3.4 of Gabion Specifications including Figure 1 for correct tying procedure and make the appropriate corrections to bring the gabion ` O O structure within conformance. As noted in the specifications, "PROPER TYING OF GABIONS AT H ALL STEPS IN THE ASSEMBLY AND CONSTRUCTION OF THE GABION STRUCTURE IS CRITICAL TO 44 THE PERFORMANCE OF THE FINISHED GABION STRUCTURE ". The Area #2 structure was not inspected with respect to tying; however, the same specifications apply and should be ■� adhered to for those gabions. 2. Per the gabion specifications, special attention shall be given that all projecting sharp ends of y wire are turned in on the completed gabion structure. Numerous projecting wires were observed on the Area #1 gabions which need to be addressed for all gabions. ■ 3. The 12" gabion slope protection at the downstream end of Area #1 does not have 3' x 3' = nominal square cells per the referenced specifications. The cells are nominally 6' x 3' or larger and the lid mesh is already bulging and gapped which will allow long -term migration and consolidation of the rock within the cells and diminish the performance of the gabion. In tt order to bring the gabions into conformance, we recommend removing the lid mesh, emptying the rock, and installing additional 3' x 1' diaphragms to the base unit to achieve 3' x 3' nominal cells. W 4. At least two points of non - closure were observed on the Area #1 gabions (i.e., there is a hole in the gabions where they were either cut or not tied correctly). These deficiencies and any other similar ones should be corrected. 5. It was observed that the 4" cedar was cut and removed to the trunk at Area #2. We presume that the City approved this removal, as it was neither called for in the plans nor required in our opinion. The City should coordinate with the Contractor should it wish to require mitigation for this tree or any others that were removed. 6. At Area #2, a portion of the row 3 gabions were installed prior to completing the backfill up to the top of row 2 gabions which allowed the row 3 gabions to settle and tilt backwards. As a result, the top /front edge of the row 3 gabions is approximately four inches out of plane. The backfill was very loose and did not appear to have been compacted sufficiently. To correct this, the row 3 gabion should be removed and the backfill should be compacted sufficiently up P.O. Box 5000, Little Elm,TX 75068 • 972.294.5000 • 1.800.422.4667 • Fax 972.294.2664 • www.oldeninc.com to the top of row 2 gabions before installing the row 3 gabions. The remaining backfill should be well compacted and sequenced such that the remaining gabion rows are not allowed to settle /tilt. 7. Rather than cut the gabion rows per plan, the existing rock /masonry steps at Area #2 were partially removed to construct the gabions. The City should determine what, if any measures should be taken to restore the steps. We are available to meet onsite to discuss any of these issues. Otherwise, a third inspection will be performed next Monday (time to be determined). Sincerely, CRAIG OLDEN, INC. Texas Engineering Firm No. F -10869 ... L CLARK ... O .. .. .... a C NSE .• i v tr i Joel R. Clark, P.E. ✓/ r /v `\ cc: Keith Marvin, P.E. —City of Coppell Kyle Whitis, P.E. — Pacheco Koch Consulting Engineers Payton Graeber — Utz Environmental Page 1 of 1 Keith Marvin - RE: Hunterwood Park gabion inspection #2 From: "Clark, Joel" <jclark(�'.&raigoldeninc.com> To: "James Graeber" <pgraebergsbcglobal.net >, <jeliasgci.coppell.tx.us >, "Keith Marvin" <KMARVIN(aci. coppell.tx.us> Date: 3/15/2010 1:20 PM Subject: RE: Hunterwood Park gabion inspection #2 Thanks Payton. Please refer to inspection report for a list of items. Feel free to call if you have any questions. -Joel From: James Graeber [mailto:pgraeber @sbcglobal.net] Sent: Monday, March 15, 2010 1:13 PM To: Clark, Joel; jelias @ci.coppell.tx.us; Keith Marvin Subject: Re: Hunterwood Park gabion inspection #2 Gentlemen - My forman informed me on Friday that there were some things that needed to be adressed. We have already started working on these issues. From: "Clark, Joel" <jclark @craigoldeninc.com> To: jelias @ci.coppell.tx.us; Keith Marvin <KMARVIN @ci.coppell.tx.us >; James Graeber < pg raeber @sbcg lobs I . net> Sent: Mon, March 15, 2010 10:11:00 AM Subject: Hunterwood Park gabion inspection #2 Gentlemen — please find attached inspection report. There are several items that need to be addressed. Please call if you have any questions. Thanks -Joel Joel R. Clark, P.E Craig Olden, Inc. Main (972) 294 -5000 Fax (972) 294 -2664 Direct (469) 287 -6105 Mobile (214) 537 -8635 jclark -craigoldeninc.com This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. This e -mail (including any attachments to it) is intended solely for the use of the individual(s) or entity named above. It may contain confidential or privileged information. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete the original message. file: HC: \Documents and Settings \radloo \Local Settings\Temp\XPgrpwise\4B 9E3 42 8 City_... 9/13/2010