ST0501-CN100325 •1 ■ BURGESS & NIPLE March 25, 2010 Mr. George Marshall, P.E. City of Coppell P.O. Box 9478 Coppell, TX 75019 Re: DeForest Road (MacArthur Blvd. to Windsor Estates) ST05 -01 Contract Amendment #2 Dear Mr. Marshall: We are asking the City of Coppell for amendment to our contract for the above referenced project. This amendment No. 2 is for additional engineering services for drainage design and analysis that was not included in the original contract. The original scope of the project had no provision for engineering services for storm sewer design or analysis at the eastern side of the project where the existing storm sewer outfalls to a pond before entering into Denton Creek. By recommendation of the City we excluded the cost of this design because that area had recent improvements to the storm sewer system through private development. After the contract was awarded further analysis was completed and concluded that the system was not adequate to handle the 100 year rainfall event. The following is a summary of work associated with the drainage analysis and design showing the approximate additional hours utilized for this design: Existing Site Analysis hours -Site visits 5 - Review of existing record drawings 20 - Meetings /communication with City Staff 5 -Runoff computations /Drainage area maps 20 Engineering Design - Horizontal alignment alternatives 10 - Profiles for alignment alternatives 15 - Preparation of Plans /Specification 5 -Cost estimates 2 Total Hours: 82 Attachment 1 is our effective hourly rates for engineering services. 1 have based the additional time on my rate of $140.00 per hour. Therefore, 82 hours at $140.00 per hour equates to $11,480.00. If this is acceptable to you please let me know or if you need this amendment to be in a different format. If you have any questions regarding this letter or work performed to date, please call. GSWW a Division of CITY OF COPPELL Burgess & Niple, Inc. By: - -_ By: Dr. Steven D. Sanders, P.E. Clay Philli Executive Vice President City Manager 11117 Shady Trail ■ Dallas, TX 75229 11 972.620.1255 ■■ BURGESS & NIPLE ATTACHMENT I ENGINEERING SERVICES HOURLY FEE SCHEDULE Effective January 2010 Description Hourly Rate* Min. - Max. Principal /Associates $170 - $250 Project Manager $130 - $190 Project Engineer $100 - $140 Graduate Engineer $ 90 - $100 Senior Technician $ 90 - $130 Technician $ 70 - $ 90 Administrative $ 70 - $ 95 Direct Expenses Cost + 15% Local Travel (Auto mileage) Current IRS Allowable Rate + 15% Subcontract Work Cost + 15% *Actual hourly rates are based upon experience level and expertise. 11117 Shady Trail 1 Dallas, TX 75229 • 972.620.1255 r y 9 1 r ♦ 4 a 1 / , w • L y-,r` . f - A + ' q " S s.a, -. '^ .�✓ r � .�• � w r "tl+ v7 4 ...1_ . � F � , , ..:.. �� nr-a Ar sVl ,�' ;� ♦� ` '� � ;' } - ,qy IL w o w J A •rJ i '.rte y a �: + �.: . x1 - ,;y,,,,,A. �• /yam �\ r Ailk o r�- 1 �_ - '+ ,<� � � a r k r�s f` "' h � �,� � � • � Lam/ :a r �� a/ ` . PROPOSED IMPROVEMENTS DEFOREST RD RECONSTRUCTION CITY OF COPPELL PROJECT ST❑ 5 -❑ 1 0 200 400 AREA OF PROPOSED IMPROVEMENTS COPPELL 1 INCH = 400 FT. cwneea o�: +e sep+emEer zaoe o-, scar t,m srcao�i� oe.�9o�sTOSOi oem,e•orw.ro�Praaecr Fxnirarsaw�xniert Created in LDDT