SW0801-ES100427 (2) (4/27/2010) George Marshall - RE: FW: Denton Tap Sidewalk Project Page 1
From: George Marshall
To: Greg Yancey
Date: 4/27/2010 4:17 PM
Subject: RE: FW: Denton Tap Sidewalk Project
Attachments: SW08 -01 PLANS 2010 SWP 7 4- 27- 10.pdf; First Baptist Church Easement _4 -27 -1
0. pdf
Greg,
I know it was awhile back that we met to discuss your concerns with the proposed sidewalk & easement.
I have been trying to work on a few other projects but now I am back on the sidewalk. We had discussed
the drainage issues along the north portion along the back of the existing inlet. I mentioned that we
would have our contractor re -grade the area between the sidewalk & flower bed including a portion of
the flower bed because it seemed a little low. We will not cause drainage problem for your site. As it is,
we will need to reset the water meters which will require more grading in that area than if there were no
meters.
The easement document includes basic language that requires the City to restore the land back to original
condition. "GRANTEE shall, except for removed obstructions, return the surface area of the Easement to
its original condition as nearly as practical taking into consideration the nature of the work being
performed"
If you need anything further please let me know.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972 - 304 -3562
»> "Greg Yancey" <gregyancey@verizon.net> 3/3/2010 8:43 AM »>
See you there
Gregory K. Yancey
Provident Company
(214) 215 -9400 v
(214) 276 -1709 f
gregyancey(a verizon.net
Original Message
From: George Marshall [mailto:gmarshaIk coppelltx.gov]
Sent: Wednesday, March 03, 2010 7:59 AM
To: Greg Yancey
Subject: RE: FW: Denton Tap Sidewalk Project
2 will work great!
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972 - 304 -3562