Subject: Re: Denton Tap Sidewalk Project
From: William Stearman <william.stearman @verizon.net
Sent: Tuesday, June 30, 2009 5:39:34 PM
To: dbaskins @ci.coppell.tx.us
CC: william.stearman @verizon.net
Dear Ms. Baskins,
Yes, I know the difference between an easement and aquiring Right -of -Way. The proposed sidewalk appears to
go under the light pole supports of TXU /Oncor.
The city can construct the sidewalk and maintain it on my property at no cost to me.
Without prejudice,
William Stearman
On Jun 30, 2009, DiWanna Baskins < > wrote:
Hello again Dr. Stearman,
I was inquiring on whether you are under the impression that an easement gives the City your land. That is
NOT the case with the easement. Easement gives us permission.
Now, acquiring Right -of -Way is totally different Right -of Way is giving the City your land or a portion of it. We
are not trying to acquire Right- of- Way.
Even if you don't change your mind. I want to make sure we are on the same page regarding the difference in
easement and Right -of -Way. Are we?
Sincerely,
DiWanna Baskins
Graduate Engineer
Engineering Department
(P)972- 304 -3562
(F)972- 304 -3570
Thanks Dr. Stearman.
It should be attached, this time.
t,tr„ ��nPtmai1 veri7nn.net/webmail/ driver ?nimlet= showcanvas &view= messageViewer &mid... 7/1/2009
Page 2 of 2
Dr. Stearman,
Thanks for taking the time to speak with me today.
I do not have a file on your property. I have solicited the Planning Department to help with locating any
correspondence or easements. Also, if you have any correspondence that might be helpful, please send it to
me.
I have attached the plan sheet 12 of 30 that shows the proposed sidewalk and location. After you view it, let
me know any questions or concerns you might have. As we discussed, the sidewalk is shown not affecting the
existing sign.
If an easement is needed, I will send this same page to our surveyor who will draw up the easement
documents containing the metes and bounds. I am requesting the easement to be one (1) foot on the outer
boundary of the proposed sidewalk. After which, I will e-mail you the documents so that you sign and return to
me; allowing the City of Coppell to construct sidewalk on your property.
Thanks again!
Sincerely,
DiWanna Baskins
Graduate Engineer