Loading...
ST0301A-AG100727 (2)T H E C I T Y O F AGENDA REQUEST FORM COPPELL T DATE: July 27, 2010 A s � ITEM #: ES - 3 WORK SESSION 0 in Discussion regarding the November 2nd Election. Discussion regarding Aerial Sewer Crossing. Discussion regarding City participation for maintenance and electric costs associated with lighting along S.H. 121. Discussion of Agenda Items. Agenda Request Form - Revised 02/07 %wksessn MEMORANDUM TO: Mayor and City Council FROM: Kenneth M. Griffin, P.E., Director of Engineering/Public Works DATE: July 27, 2010 REF: Discussion concerning a proposed change order associated with Bethel Road ST 03 -01A from Penfolds to Denton Tap. During the course of the removal and replacement of the existing bridge along Denton Creek on Bethel Road, an opportunity has presented itself that would eliminate an ongoing maintenance issue for the City of Coppell. The main trunk sewer line along Bethel Road utilizes a siphon system as it crosses Grapevine Creek. In essence, a properly working siphon system allows the sewer line to be constructed down one bank, below the creek bed and back up the other bank and then continue into a gravity system. With a correctly operational siphon system, you do create those rare situations where sewage does flow uphill. We do have other siphon systems in town that work correctly; however, this particular system along Bethel Road has been an ongoing maintenance issue since it was constructed in the mid -90's. Because of the removal of the bridge, we have an opportunity to drill several additional piers adjacent to the bridge and construct and aerial crossing that would eliminate the existing siphon. The design of the aerial crossing has been performed in house by Keith Marvin, P.E., Project Engineer; however, the negotiations with the contractor are not yet complete. To continue moving forward with the project, we need to move forward with the drilling of the piers prior to additional work taking place on the bridge structure. Based on initial discussions with the contractor utilizing the preliminary plans, it's anticipated this change order will cost between $90,000.00 and $100,000.00. Staff is seeking general consensus to move ahead with the removal of the siphon and the installation of an aerial sewer crossing, with a change order to follow potentially at the August 24 Council meeting. Staff will be available to answer any questions at the Council meeting. � �� U Z .i9d Q j N D Q f � . � • S C J C5 r Q J 0 i — z in Q �, D W > M o C) a Q 0 0 U U � of J C w o Z � a W LO W w 3 3: W U w Z r LO 0 W EL o U] a w , I o f •. . i n , r L Q n a • � L.L M i U 0 Z 0 F U _ • . i khkL } Ln 0 U) LL r a00 ow a 41r 0� o� a — r �. •+. Ll u w ow l W Z "• m ie C7O Lu 19 LLI HW .r !n p d a �r 19 LU LLJ W -i H am ° w > a w cn w Cf) of CD Ld o U LL ) X o LLI N (") I I t C=J z o W z L] o IL i 10 0 L9 IL uj Ll EL Ll Iw ,e