ST0301A-AG100810AGENDA REQUEST FORM T H E . ` , T Y . a F DEPT: Engineering COPPELL DATE: August 10, 2010 k S ITEM #: 8/E n WORK SESSION n CONSENT 1:1 REGULAR ITEM TYPE: CONTRACT /BID or PROPOSAL ITEM CAPTION: Consider approval of Change Order Number 2 to the Bethel Road IIA (ST 03 -01 A) project in the amount of $98,431.33 for construction of an aerial sewer crossing of Grapevine Creek and minor utility adjustments, as provided for by Water and Sewer operating revenues; and authorizing the City Manager to sign all necessary documents. GOAL(S): EXECUTIVE SUMMARY: Approval of this change order will allow the city to replace an existing siphon, which is a weekly maintenance issue, with an aerial crossing. FINANCIAL COMMENTS: Funds for this change order will be provided by Water and Sewer operating revenues. RECOMMENDED ACTION: ACTION TAKEN BY COUNCIL: Staff recommends approval of Change Order #2 in the amount of $98,431.33 and will be present to answer any questions. APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve M - Tunnell S - Hunt Vote - 7 -0 Libby Ball 2010.08.11 11:10:41 - 05'00' I #ChgeOrd2l BethelRd. -]A MEMORANDUM TO: Mayor Pro Tem and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: August 10, 2010 RE: Consider approval of Change Order Number 2 to the Bethel Road IIA (ST 03 -01A) project in the amount of $98,431.33 for construction of an aerial sewer crossing of Grapevine Creek and minor utility adjustments, as provided by Water and Sewer operating revenues; and authorizing the City Manager to sign all necessary documents. On April 27, 2010 council awarded a contract to JRJ Paving, LP in the amount of $2,089,019.05 for the reconstruction of Bethel Road from Denton Tap to Penfolds Lane. This award amount included a $120,000.00 potential bonus set aside for early completion. Since this award, one previous change order has been approved that increased the contract amount by $23,505.50. As discussed in work session at the July 27 City Council Meeting, this change order allows us to replace a sanitary sewer siphon that conveys sewer across Grapevine Creek with a new aerial crossing. This siphon was built in the early 1990's and consists of two smaller diameter pipes with a diversion box on the upstream side of the sewer line. These small lines are often clogged by rags that enter the sewer system from the industrial properties along West Bethel Road. When the system becomes clogged, it no longer works. City staff currently spends many hours every week checking on this siphon, and cleaning it out on a weekly or semi - weekly basis. The proposed aerial crossing will be a 12" sewer pipe, and would maintain a constant grade across the creek. The sewer pipe will be encased in a larger diameter steel pipe supported by piers, and will be above the normal water level of the creek. In addition to the aerial crossing this change order includes some miscellaneous utility adjustments necessary to reconcile the design plans with the field conditions. These include the bracing of a utility pole, a 24" concrete plug, and demolition of an old aerial crossing structure. Approval of this change order will allow the contractor to move forward with the replacement of this siphon while the bridge is closed and under construction. It's our opinion that the contractor has provided fair and reasonable pricing for these changes, and we recommend approval of this change order in the amount of $98,431.33. Staff will be available to answer any questions at the council meeting. � �� U Z .i9d Q c� z 0 D Of O U U Of J w a o Z a w a Of LLJ w Z Q 0 w V) 0 0 w� ,a I 41r e. 00 Z LLI r U) 0 o :2 t w of U �. w J a m �o w� a U) V) 0 c+� N D 0 J z r Q J 0 in Q w , W ' C] Q00 in LL w 0 UM W Z U 0 U) W �m IL 00 °w 0 EL All U or W W z 90 Lu 19 z CA W 1. d Q 'r °� � W IL W LLJ H U) Of W 0 F-: LL o c� L2 u 2 U Z 0 LO 0 W °a. F 'm y � I 0 'w ' a. IL EL R Z ® J W ► 0 10 Q a a a o � ._ o va ' il W z0 Ln — m w 0 U) W �m IL 00 °w 0 EL All U or W W z 90 Lu 19 z CA W 1. d Q 'r °� � W IL W LLJ H U) Of W 0 F-: LL o c� L2 u 2 U Z 0 IL i LO L9 IL Ln EL Ll Iw ,e CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Bethel Road H (ST 03 -01A) CONTRACTOR: JRJ Paving, L.P. OWNER: City of Coppell CHANGE ORDER NO.: Two (2) DATE: August 10, 2010 1. Replace old sanitary sewer siphon with new aerial crossing. 2. Miscellaneous utility adjustments. Page 1 of 2 Item Description Quantity Unit Unit Price Total ADD: 1. Demo old aerial 1 LS $5,491.25 $5,491.25 crossing with piers 2. 30" Drilled shaft 20 LF $204.00 $4,080.00 3. 30" Formed 20 LF $306.00 $6,120.00 column 4. Aerial crossing pier 2 EA $1,437.50 $2,875.00 cap 5. Stainless straps 4 EA $402.50 $1610.00 6. Concrete anchors 2 EA $1,173.00 $2,436.00 7. Concrete pipe 20 LF $72.45 $1,449.00 encasement 8. Transition 2 EA $$448.50 $897.00 couplings 9. Connect to existing 2 EA $1,207.50 $2,415.00 10. 12" SDR -35 in 140 LF $134.55 $18.837.00 casing with spacers 11. 20" coated steel 120 LF $223.10 $26,772.00 casing 12. Remove existing 1 LS $7.820.00 $7,820.00 siphon box 13. Remove existing $1,610.00 manhole 14. Sewer by -pass 1 LS pumping 15. De- watering 15. Testing 16. 24" Concrete plug 17. Install new blow -off $4,560.00 assembly 18. Bracing utility pole $676.08 Total Additions: 1 LS $1,610.00 $1,610.00 1 LS $7,245.00 $7,245.00 1 LS $2,645.00 $2,645.00 1 LS $483.00 $483.00 1 EA $500.00 $500.00 1 EA $4,560.00 $4,560.00 1 LS $676.08 $676.08 $98,431.33 Previous contract amount $1,969,019.05 Net increase in contract amount Change Order # 1 $23,505.50 Net increase in contract amount Change Order # 1 $98,431.33 Revised contract amount $ 2,090,955.88 Net increase in contract time of completion 0 Revised Contract time of completion 270 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Recommended by City Engineer Date Agreed to by Contractor Date Accepted by City Date