Loading...
MA0901-CS090714 Page 1 of 2 Keith Marvin - RE: Kimbel Kourt-Elevations From:   "Lee Halencak" <lee@bowmanconstruction.com> To:"'Michael Garza'" <mgarza@ci.coppell.tx.us>, "'Albert Samaniego'" <ASAMANIEGO@ci.coppell.tx.us>, "'Keith Marvin'" <KMARVIN@ci.coppell.tx.us>,     "'Scott Latta'" <SLATTA@ci.coppell.tx.us> Date:   7/14/2009 6:28 PM Subject:   RE: Kimbel Kourt-Elevations CC:   <adrian@bowmanconstruction.com>   Thanks Michael for the quick response,   I have been in contact with my surveyor and he told me Scott has transferred the information to him.  Please go ahead and revise the sheet and send to me so I can make sure we are all on the same page.   Lee M. Halencak, P.E. Jim Bowman Construction Co., L.P. 1111 Summit Avenue, Suite 1 Plano, Texas 75074 Office: 972-423-1313 Fax:  972-423-9447 Mobile:  972-339-8511 lee@bowmanconstruction.com From: Michael Garza [mailto:mgarza@ci.coppell.tx.us] Sent: Tuesday, July 14, 2009 4:34 PM To: Albert Samaniego; Keith Marvin; Lee Halencak; Scott Latta Cc: adrian@bowmanconstruction.com Subject: Re: Kimbel Kourt-Elevations   Mr. Halencak, We have come to the solution of rasing the PVI at STA 2+00 (.3) to 447.77. This should give us positive drainage.   If you have any further questions please contact me at your convenience.   Thanks,     Michael Garza Engineering Dept. City of Coppell Office: 972-304-7019 Fax:  972-304-3570      Please consider the environment before printing this e-mail >>> On 7/14/2009 at 10:49 AM, in message <0KMS00J1X3XU0OI2@vms173005.mailsrvcs.net>, "Lee Halencak" <lee@bowmanconstruction.com> wrote: Gentlemen,   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4A5CCE49City_...9/16/2010 Page 2 of 2 Our surveyor has been on site to stake the Kimbel Kourt Project.  With the existing elevations on the south end of the project at the tie in point and the proposed high point at station 2+00 the grade of the roadway is approximately 0.2%.  This is well below the 0.5% minimum set by the city.  This presents a problem with drainage and a solution needs to be made quickly in order of us to complete the project before the start of school.  We are at a standstill until the elevations can be worked out.  Without proper elevations and a solution we can not set grade and get anything installed.  We are only being paid to go out there once and we don’t want to have to do anything twice which could be the case if we continue before these elevations are resolved.  It is extremely important that a solution be in place very quickly.   A possible solution is to remove approximately 20’ of additional pavement on the south end and move the proposed high point to the north.  This will gain more of an elevation difference and get us closer to the 0.5% grade.  This solution would require that the approach to the pump station to be redesigned to remove additional pavement.   Our surveyor has been working with Scott and once he verifies the existing elevations we ask that solution be put in place for us to continue our work.   Thanks   Lee M. Halencak, P.E. Jim Bowman Construction Co., L.P. 1111 Summit Avenue, Suite 1 Plano, Texas 75074 Office: 972-423-1313 Fax:  972-423-9447 Mobile:  972-339-8511 lee@bowmanconstruction.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4A5CCE49City_...9/16/2010 Page 1 of 1 Keith Marvin - Kimbel Kourt-Elevations From:   "Lee Halencak" <lee@bowmanconstruction.com> To:"'Keith Marvin'" <KMARVIN@ci.coppell.tx.us>, "'Albert Samaniego'"     <ASAMANIEGO@ci.coppell.tx.us>, <mgarza@ci.coppell.tx.us>, <slatta@ci.coppell.tx.us> Date:   7/14/2009 10:53 AM Subject:   Kimbel Kourt-Elevations CC:   <adrian@bowmanconstruction.com>   Gentlemen,   Our surveyor has been on site to stake the Kimbel Kourt Project.  With the existing elevations on the south end of the project at the tie in point and the proposed high point at station 2+00 the grade of the roadway is approximately 0.2%.  This is well below the 0.5% minimum set by the city.  This presents a problem with drainage and a solution needs to be made quickly in order of us to complete the project before the start of school.  We are at a standstill until the elevations can be worked out.  Without proper elevations and a solution we can not set grade and get anything installed.  We are only being paid to go out there once and we don’t want to have to do anything twice which could be the case if we continue before these elevations are resolved.  It is extremely important that a solution be in place very quickly.   A possible solution is to remove approximately 20’ of additional pavement on the south end and move the proposed high point to the north.  This will gain more of an elevation difference and get us closer to the 0.5% grade.  This solution would require that the approach to the pump station to be redesigned to remove additional pavement.   Our surveyor has been working with Scott and once he verifies the existing elevations we ask that solution be put in place for us to continue our work.   Thanks   Lee M. Halencak, P.E. Jim Bowman Construction Co., L.P. 1111 Summit Avenue, Suite 1 Plano, Texas 75074 Office: 972-423-1313 Fax:  972-423-9447 Mobile:  972-339-8511 lee@bowmanconstruction.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4A5C63A0City_...9/16/2010