WA0601-CS090729 (9/16/2010) Keith Marvin - RE: Hunterwood Water LinePage 1 From: "Lee Halencak" <lee@bowmanconstruction.com> To: "'Keith Marvin'" <KMARVIN@ci.coppell.tx.us> CC: "'Carol Dye'" <CDYE@ci.coppell.tx.us> Date: 7/29/2009 6:03 PM Subject: RE: Hunterwood Water Line If you don't find it I can send you the copies that I saved. Not too sure what could have happened to the rest of it. I double checked the envelope before sent and remember adding the transmittal form. Lee M. Halencak, P.E. Jim Bowman Construction Co., L.P. 1111 Summit Avenue, Suite 1 Plano, Texas 75074 Office: 972-423-1313 Fax: 972-423-9447 Mobile: 972-339-8511 lee@bowmanconstruction.com -----Original Message----- From: Keith Marvin [mailto:KMARVIN@ci.coppell.tx.us] Sent: Wednesday, July 29, 2009 5:25 PM To: lee@bowmanconstruction.com Cc: Carol Dye Subject: Re: Hunterwood Water Line Let me look into it. I was told we didn't get it. Keith -----Original Message----- From: "Lee Halencak" <lee@bowmanconstruction.com> To: Keith Marvin <KMARVIN@ci.coppell.tx.us> Sent: 7/29/2009 5:19:24 PM Subject: RE: Hunterwood Water Line Keith, I just left you a message. But within the same envelope that was delivered contained 2 copies of the signed final pay request, consent of surety to final payment and contractors affidavit to final payment. Did they not make it? Lee M. Halencak, P.E. Jim Bowman Construction Co., L.P. 1111 Summit Avenue, Suite 1 Plano, Texas 75074 Office: 972-423-1313 Fax: 972-423-9447 Mobile: 972-339-8511 lee@bowmanconstruction.com -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] (9/16/2010) Keith Marvin - RE: Hunterwood Water LinePage 2 Sent: Wednesday, July 29, 2009 4:57 PM To: Lee Halencak Subject: Hunterwood Water Line Lee, We recieved the signed change order for the additional concrete on this project. We still need the final pay request and affidavit of final payment so we can close out the project. Please forward these items to me so I can get them processed. Thanks. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 (9/16/2010) Keith Marvin - RE: Hunterwood Water LinePage 1 From: "Lee Halencak" <lee@bowmanconstruction.com> To: "'Keith Marvin'" <kmarvin@ci.coppell.tx.us> Date: 7/29/2009 5:23 PM Subject: RE: Hunterwood Water Line Keith, I just left you a message. But within the same envelope that was delivered contained 2 copies of the signed final pay request, consent of surety to final payment and contractors affidavit to final payment. Did they not make it? Lee M. Halencak, P.E. Jim Bowman Construction Co., L.P. 1111 Summit Avenue, Suite 1 Plano, Texas 75074 Office: 972-423-1313 Fax: 972-423-9447 Mobile: 972-339-8511 lee@bowmanconstruction.com -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Wednesday, July 29, 2009 4:57 PM To: Lee Halencak Subject: Hunterwood Water Line Lee, We recieved the signed change order for the additional concrete on this project. We still need the final pay request and affidavit of final payment so we can close out the project. Please forward these items to me so I can get them processed. Thanks. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681