ST9304-CS 870825MEMORANDUM August 25, lgFI7 TO: FROM: RE: Alan Ratliff, City Manager Steve Morton, Chief of Land Development Beltline - MacArthur Intersection Update As of August 75, Ig87 the intersection itself is substantially complete. ~gnals were turned on signal for a "T" intersection at 1 p.m. on I)-24-1)7. All pe~nent signage are in place thanks to the efforts of Dana Kamp our Signs/Signals Technician. MacArthur Blvd. (North of IR/R) will have its buttons in place this week and a final walk through has been scheduled for I)-27-87 at 1p.m.. The only item left to complete is the railroad crossing installation and energizing thel~controller, which the railroad will do. Jean Maier and I have had several conversations with Dave Andrew of St. Louis and Southwest Railroad. I was previously told by Dave on 7-27-87 that es soon as they completed their emergency repairs in Tyler they would start the' Coppell site. The latest conversation was 1)-25-87 when Jean Maier was told by Dave Andrew "We will be there when we get there". At this time ~ have no idea when the railroad intends to complete their crossing. As per your request for responsible parties on Beltline - MacArthur: Owner -Tarra Land - Jay Patterson, Mike Daniel Engineering - Nathan D. Maier- Jean Meier Construction - APAC - Ken Rochell Railroad - St. Louis and Southwest Railroad - Dave Andrew g34-g4q4 73g-q741 ;74.1~3531 372-7q5g SMM/bb cc: Steve Goram, Director of Public Works ~s~ ve -~~~l:~en t