ST9304-CS 870825MEMORANDUM
August 25, lgFI7
TO:
FROM:
RE:
Alan Ratliff, City Manager
Steve Morton, Chief of Land Development
Beltline - MacArthur Intersection Update
As of August 75, Ig87 the intersection itself is substantially complete. ~gnals
were turned on signal for a "T" intersection at 1 p.m. on I)-24-1)7. All pe~nent
signage are in place thanks to the efforts of Dana Kamp our Signs/Signals
Technician.
MacArthur Blvd. (North of IR/R) will have its buttons in place this week and
a final walk through has been scheduled for I)-27-87 at 1p.m..
The only item left to complete is the railroad crossing installation and energizing
thel~controller, which the railroad will do. Jean Maier and I have had several
conversations with Dave Andrew of St. Louis and Southwest Railroad. I was
previously told by Dave on 7-27-87 that es soon as they completed their
emergency repairs in Tyler they would start the' Coppell site. The latest
conversation was 1)-25-87 when Jean Maier was told by Dave Andrew "We will
be there when we get there". At this time ~ have no idea when the railroad
intends to complete their crossing.
As per your request for responsible parties on Beltline - MacArthur:
Owner -Tarra Land - Jay Patterson, Mike Daniel
Engineering - Nathan D. Maier- Jean Meier
Construction - APAC - Ken Rochell
Railroad - St. Louis and Southwest Railroad - Dave Andrew
g34-g4q4
73g-q741
;74.1~3531
372-7q5g
SMM/bb
cc: Steve Goram, Director of Public Works
~s~ ve -~~~l:~en t