Loading...
FS9902-CS 981229 ��� / CppellTeas75019 7ML The City With A Beautiful Future PO. BOX 478 972 - 462 -0022 (---- COPPELL, TEXAS 75019 i s ---- ) M / 1 V 4) V/k.) 1 December 29, 1998 Ron Morrison, P.E. Morrison Hydrology Engineering, Inc. 210 Arnold Arlington, TX 76010 RE: Flood Study Elm Fork of Trinity River at Belt Line Road Dear Mr. Morrison: On Monday December 28, 1998 two copies of the referenced flood study were delivered to my office. As you are aware, prior to any review by this office, there are required fees that need to be paid. Those fees are as follows: $2,000 for the review of the Conditional Letter of Map Revision that will eventually go to FEMA, $1,000 for the review of the Corridor Development Certificate and $1,500 for the Corridor Development Certificate by the Corps of Engineers. The review of the Conditional Letter of Map Revision and the initial review of the Corridor Development Certificate are performed by the City's consultant and the additional $1,500 is for the submittal of the Corridor Development Certificate to the Corps of Engineers for their review. Please make arrangements to have the copies of the flood study that were submitted to this office on December 28, 1998 picked up. If arrangements are not made to have them picked up, they will be mailed back to your office for resubmittal in the following manner: 1. Two copies of the flood study for the Conditional Letter of Map Revision; 2. Two separate copies of the submittal for the Corridor Development Certificate; 3. A check in the amount of $4,500 for the review of the study. If you should have any questions concerning this issue please feel free to contact this office at your convenience. Sincerely, Kenneth M. ti m, P.E. Director of Engineering and Public Works file /floodplain /elmfrkfs