Loading...
MA1001-CS100917 T f� • C I T F ,,„, F 1 4 X A S 8 September 17, 2010 Adrian Bowman Jim Bowman Construction Co., L.P. 2716 S. Rigsbee Dr. Plano, TX 75074 RE: MA 10 -01 Denton Tap & Sandy Lake Brick Paver Replacement Final Acceptance Dear Mr. Bowman: Representatives of the City of Coppell have confirmed a final inspection of work on the referenced project. The two -year maintenance bond has been received. Maturity on the bond will be two years from the date of this letter. A follow -up inspection of the facilities will be conducted prior to the lapse of the two -year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thank you for your cooperation during the course of the project. Sincerely, 7 Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: George Marshall, P.E., Civil Engineer Ken Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Project Engineer Glenn Hollowell, P.E., Asst. Director of Public Works 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673