September 17, 2010
Adrian Bowman
Jim Bowman Construction Co., L.P.
2716 S. Rigsbee Dr.
Plano, TX 75074
RE: MA 10 -01 Denton Tap & Sandy Lake Brick Paver Replacement
Final Acceptance
Dear Mr. Bowman:
Representatives of the City of Coppell have confirmed a final inspection of work on the referenced
project. The two -year maintenance bond has been received. Maturity on the bond will be two years
from the date of this letter.
A follow -up inspection of the facilities will be conducted prior to the lapse of the two -year bond
period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thank
you for your cooperation during the course of the project.
Sincerely,
7
Rick O'Dell
Construction Inspector
Office Phone: (972) 304 -7090
Fax: (972) 304 -3570
cc: George Marshall, P.E., Civil Engineer
Ken Griffin, P.E., Director of Engineering & Public Works
Keith Marvin, P.E., Project Engineer
Glenn Hollowell, P.E., Asst. Director of Public Works