Loading...
ST9905-CS100921 T H E C 1 T Y O F COPPELL 1 �a 9 September 21, 2010 Robert Caudill VIA CERTIFIED MAIL Tiseo Paving Company PO Box 270040 Dallas TX 75227 RE: Bethel Rd. Project #ST 99 -05 Repairs Needed Under Maintenance Period - SECOND NOTICE Dear Mr. Caudill: The two -year term on the above referenced maintenance bond began on June 1, 2009, which was the date of final acceptance of the project. As stated in the July 1, 2010 letter I sent via certified mail to your attention, a periodic follow -up inspection revealed problems that should be corrected as soon as possible so that further deterioration can be prevented. In addition to the curb failures west of Royal Lane, more failures have occurred and are occurring to the extent that concrete curbing material is falling into lanes of traffic, causing a safety issue for motorists. Also as mentioned in the previous letter, expansion joint sealer is coming up out of the pavement along the entire project limits. Contact me at the number below at your earliest convenience to give me a date certain when your crews will be onsite to do the repairs. If another letter on this issue is necessary, it will be copied to your surety bond company. Si i rel , 1 , ', - Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Project Engineer Glenn Hollowell, P.E., Asst. Director of Public Works A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV