Loading...
WA9903-CS000508SHIMEK, JACOBS & FINKI,EA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. ROSS L. JACOBS, P.E. I. C. F1NKLEA, P.E. JOHN R. BAUMGARTNER, P.E. May 8, 2000 Phone (214) 361-7900 Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell P. O. Box 478 Coppell, Texas 75019 Re: Addition of Pump Number 4 at the Village Parkway Pump Station Change Order Number 2 (Revised) Dear Mr. Griffin: We are enclosing six original sets of Changer Order Number 2 to the City of Coppell's contract with AUI General Contractors for the construction of the Addition of Pump Number 4 to the Village Parkway Pump Station. Change Order Number 2 covers the extra work and cost associated with the installation of a new pressure tap in the meter vault and the adjustments required to the suction piping for Pump Number 4. If the change order is acceptable, please have all six sets executed on behalf of the City of Coppell and return three sets to this office. We are available to discuss this project further at your convenience. Sincere ours Enclosures j :~lerical\coppell\1999-153\letters\const~k\change order 2 to city.doe CITY OF COPPELL, TEXAS ADDITION OF PUMP NO. 4 ATTHE VILLAGE PARKWAY PUMP STATION Project No. WA99-03; Bid No. Q-119902 CHANGE ORDER NO. 2 (Raised) Cs De INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Architectural Utilities, Inc., P.O. Box 11586, Fort Worth, Texas 76110, for the Addition of Pump No. 4 at the Village Parkway Pump Station, dated December 14, 1999. DESCRIFHON OF CHANGE This change covers the installation of W' tap in 36" pipe for pressure transmitter, and the modification of the suction piping required for Pump No. 4. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: Item Previous Quantity Revised Unit Amount No. Description Quantity This C.O. Quantity Unit Price of Change 5 Install W' tap in 36" pipe for 0 1 1 L.S. $227.00 $227.00 pressure transmitter Field Adjustments to Suction Piping (Pump No. 4) 6 0 1 1 L.S. 765.00 765.00 Total:[ $992.00 Original Contract Amount Amount, Change Order No. 1 Amount, Change Order No. 2 Revised Contract Amount $346,000.00 10,684.00 992.00 $357,676.00 EFFECT OF CHANGE ON CONTRACT TIME The contract time shall not be affected by this change order. AGREEMENT By the signatures below of duly authorized agents, the City of Coppell and Architectural Utilities, Inc.,' do hereby agree to append this Change Order No. 2 to the original contract between themselves dated December 14, 1999. Ci p ell, Texas By: t2st: (/~ -- j:XcAefim'~m1999-1~3'~:sXdm~.~-o~>-2.d~ (04/19/00) Date: Attest: Architectural Utilities, Inc. f~ Coz~actor L/ Page 1 of 1