May 8, 2000
Phone (214) 361-7900
Mr. Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
City of Coppell
P. O. Box 478
Coppell, Texas 75019
Re: Addition of Pump Number 4 at the Village Parkway Pump Station
Change Order Number 2 (Revised)
Dear Mr. Griffin:
We are enclosing six original sets of Changer Order Number 2 to the City of Coppell's contract with AUI
General Contractors for the construction of the Addition of Pump Number 4 to the Village Parkway Pump
Station. Change Order Number 2 covers the extra work and cost associated with the installation of a new
pressure tap in the meter vault and the adjustments required to the suction piping for Pump Number 4.
If the change order is acceptable, please have all six sets executed on behalf of the City of Coppell and return
three sets to this office. We are available to discuss this project further at your convenience.
Sincere ours
Enclosures
j :~lerical\coppell\1999-153\letters\const~k\change order 2 to city.doe
CITY OF COPPELL, TEXAS
ADDITION OF PUMP NO. 4
ATTHE
VILLAGE PARKWAY PUMP STATION
Project No. WA99-03; Bid No. Q-119902
CHANGE ORDER NO. 2 (Raised)
Cs
De
INTENT OF CHANGE ORDER
The intent of this change order is to modify the provisions of the contract entered into between the City of
Coppell, Texas and Architectural Utilities, Inc., P.O. Box 11586, Fort Worth, Texas 76110, for the Addition
of Pump No. 4 at the Village Parkway Pump Station, dated December 14, 1999.
DESCRIFHON OF CHANGE
This change covers the installation of W' tap in 36" pipe for pressure transmitter, and the modification of the
suction piping required for Pump No. 4.
EFFECT OF CHANGE ON CONTRACT AMOUNT
This change order will have the following effect on the cost of this project:
Item Previous Quantity Revised Unit Amount
No. Description Quantity This C.O. Quantity Unit Price of Change
5 Install W' tap in 36" pipe for 0 1 1 L.S. $227.00 $227.00
pressure transmitter
Field Adjustments to Suction
Piping (Pump No. 4)
6 0 1 1 L.S. 765.00 765.00
Total:[ $992.00
Original Contract Amount
Amount, Change Order No. 1
Amount, Change Order No. 2
Revised Contract Amount
$346,000.00
10,684.00
992.00
$357,676.00
EFFECT OF CHANGE ON CONTRACT TIME
The contract time shall not be affected by this change order.
AGREEMENT
By the signatures below of duly authorized agents, the City of Coppell and Architectural Utilities, Inc.,' do
hereby agree to append this Change Order No. 2 to the original contract between themselves dated
December 14, 1999.
Ci p ell, Texas
By:
t2st: (/~ --
j:XcAefim'~m1999-1~3'~:sXdm~.~-o~>-2.d~ (04/19/00)
Date:
Attest:
Architectural Utilities, Inc.
f~ Coz~actor
L/
Page 1 of 1