Loading...
ST8801-CS 900301 , March 1, 1990 Kimley-Horn & Associates, Inc. Dallas, Texas 75251 ,.~ RE: Sandy Lake Road at MacArthur Blvd. ~/~/ (Intersection Design Construction Plans) Dear Mr. Middleton: We have reviewed the construction plans you submitted on the above referenced project and provide you with the attached mark up plan for revision. Also in response to your letter dated December 5, 1989, we have the following comments and/or response, according to your numbered items. 1. Per the Subdivision Ordinance, the required right-of-way for a six lane major thoroughfare is llO'.feet and within 300 feet of an intersection 130'. Provide a right-of-way key map and show existing and proposed right-of-way. Please provide your recommendation, indicating where the needed right-of-way needs to be be obtained. 2. On the above mentioned key map, as requested, please show what the existing and proposed right-of-way for MacArthur Boulevard at said intersection is and how to obtain the needed right- of-way. As per your telephone conversation with Shohre Daneshmand of our office and per your request, we have checked our files again and attached is what we can provide you or MacArthur Boulevard, north of said intersection. 3. Yes, this major intersection is considered a primary zone and needs to be constructed per the streetscape plan, which has been provided to you at the start of this project. 4. Yes, the response is the same as above, item #3. 5. We have provided to you all construction plans available to us. Shohre provided you the necessary information to get any other needed plans from other engineering companies. Also you can check with Ron Morrison of your office for any related hydraulic information. He has the best information for the City of Coppell. 6. Yes, all pavement markings and signage will be done as part of this contract. 7. Yes, utility relocation will be required as part of this contract. 8. On the construction plan, show the length and the height of the retaining wall that needs to be installed and the type. As per your discussion with Shohre Daneshmand of our office, please provide two revised set of construction plans and a status report by Monday, March 12, 1990. If you have any questions, please contact Shohre Daneshmand or myself at 462-8495. Sinc~~,, ~ ~  /City Engineer / ./ RRm/MSD/bb/ymh xc: Steve Goram, Director of Public Works Shohre Daneshmand, P.E., Civil Engineer